Search results
- Development work on representing census data on the population grid was incomplete, as address points needed to be consolidated ... This project was a continuation of a previous project and concerned the development of datasets based on a population grid. The ...5 KB (721 words) - 12:45, 8 April 2024
- The project was to meet these objectives by providing user-friendly GIS tools. It was seen as a first step towards the further ... The first part of the work was an assessment of the technical infrastructure, in other words the ArcGIS platform developed for ...3 KB (476 words) - 15:11, 8 April 2024
- A geocoded address dataset for Hungary was acquired along with map layers. The latter included polygons of individually generated ... The main challenge was to connect the geocoded address dataset with the existing address register of the statistical office, as ...4 KB (527 words) - 14:29, 8 April 2024
- A lack of information meant that it was not possible to visualise or analyse migratory flows into Italy from specific provinces ... The starting point for the project was the database on new residence permits, which provided a source of information for detailing ...7 KB (986 words) - 12:47, 8 April 2024
- Prior to the initiation of this project there was a lack of know-how and experience for merging statistics and geospatial information ... system (GIS) tools. By doing so, one of the main objectives of the project was to integrate geographical and statistical information to ...6 KB (884 words) - 12:46, 8 April 2024
- There was no harmonised system to help generate a complete list of addresses for various statistical units. There was a lack of ... (ADS). As such, a methodology for the treatment of non-valid addresses was developed and implemented. Cooperation with the Estonian ...7 KB (955 words) - 12:48, 8 April 2024
- specific data source (Sotkanet REST API). One of the principal objectives was to refactor the thematic map functions to be more general ... The National Land Survey of Finland (Maanmittauslaitos) was responsible for designing the user interface and implementing the ...4 KB (586 words) - 15:11, 8 April 2024
- The aim of the project was to improve the statistical production process through the integration of spatial information on core ... health care services and capacity. In a first step, an iterative process was used to select a range of indicators relevant for an analysis ...5 KB (763 words) - 12:45, 8 April 2024
- only included basic parts of addresses for local units and enterprises and was missing information on geographical location. ... The aim of this project was to add information on geographical locations (geo-referencing) to the statistical business register ...7 KB (1,104 words) - 12:49, 8 April 2024
- There was not a complete and fully operational cadastre and therefore no complete and coherent georeferenced buildings register ... The aim was to develop an application that could make geolocation enabled e-questionnaires available for use on the mobile devices ...6 KB (944 words) - 15:12, 8 April 2024
- The project started with an analysis of user needs/requirements and the specification of a user interface. The target was to produce ... A preliminary technical specification was developed with the aim that this should be reusable in other organisations and countries ...5 KB (682 words) - 14:28, 8 April 2024
- The project was devised to answer several questions. #What is the usability of different types of aerial and satellite images for ... The aim of the project was to evaluate whether deep learning models could be developed that worked across different EU Member ...8 KB (1,152 words) - 15:09, 8 April 2024
- * Page views: the number of times a page was visited. * Unique page views: the number of times a page was uniquely visited. If a visitor views a page several times during one session ...3 KB (372 words) - 15:38, 10 April 2024
- The first step of the work was to establish a connection between this registry of public areas and an address register and address ... An existing address maintenance application was updated. The addresses in the register of public places were checked and corrected ...6 KB (851 words) - 12:49, 8 April 2024
- Traditionally, the compilation of small area statistics was an activity for which Statistics Finland charged a fee. New standards ... This project was carried out in cooperation between Statistics Finland and the National Land Survey of Finland during 2014 and ...7 KB (1,028 words) - 12:47, 8 April 2024
- The first objective of the project was to develop a 1 km² population grid for Greece based on the 2001 census data and to put ... The second objective was to develop a web mapping application. ===Method=== In order to create a population grid based on 2001 ...6 KB (939 words) - 10:43, 8 April 2024
- The objective of this project was to analyse the (spatial/grid-based) distribution of businesses (legal units) according to their ... The State Geodetic Administration (National Mapping Agency) was the source of information for maps, centroids and shapefiles. ...6 KB (811 words) - 12:51, 8 April 2024
- The objective of this project was to model indicators of accessibility for the resident population with respect to public infrastructure ... The main data source for infrastructure was the census of enterprises and their local units of employment (LUE). Units were classified ...7 KB (1,023 words) - 12:52, 8 April 2024
- The main objective of this project was the integration of geospatial and statistical information. Specifically, the objective ... The second objective of the project was to illustrate how linking geographical and statistical information and corresponding metadata ...8 KB (1,138 words) - 12:51, 8 April 2024
- the 2017 reform of municipalities, with many municipalities merging (the number was reduced from 213 to 79). ===Objectives=== ... – Saaremaa and Setomaa. An overview of statistical indicators was provided, describing their meaning, usefulness, and how ...5 KB (627 words) - 15:10, 8 April 2024