Research & Innovation - Participant Portal

Search

TOPIC : Network collaborative Management

Topic identifier: SESAR-VLD1-03-2016
Publication date: 15 December 2016

Types of action: SESAR-IA Innovation action
DeadlineModel:
Opening date:
single-stage
15 December 2016
Deadline: 11 May 2017 17:00:00

Time Zone : (Brussels time)
  Horizon 2020 H2020 website
Pillar: Societal Challenges
Work Programme Year: H2020-JTI-SESAR-2016
Work Programme Part: SESAR Work Plan 2016
Topic Description
Specific Challenge:

Network Collaborative Management (NCM) processes includes the participation of local actors in Air Traffic Flow Control Management (ATFCM). Airports, Flow Management Positions (FMP) located at European Air Navigation Service Providers (ANSP) now bear collaboratively with the Network Manager (NM) the management of DCB processes.

This demonstration will demonstrate Airspace User (AU) involvement in Demand Capacity Balancing (DCB) Collaborative Decision Making (CDM) processes managed by FMPs and by airports, in accordance with the PCP AF#4.

With reference to the SJU Annual Work Programme 2016, this topic covers Section 3.5.4, sub Work Area 2.1 topic c).

The new NCM concept of operations offers increased opportunities for AUs to participate in DCB CDM processes, because they can now collaborate with local DCB actors as well as with NM. The active involvement of AUs in this demonstration is needed for the evaluation in a live environment of these concepts and the quantification of their benefits.

Scope:

NCM has been subject to research in the SESAR programme. Mature results are publicly available in the solution packs for the following SESAR solutions:

  • SESAR solution 56 (ATFM Slot Swapping)

  • SESAR solution 57 (UDPP Departure)

  • SESAR solution 17 (Advanced Short Term ATFCM Measures (STAM))

  • SESAR solution 18 (CTOT and TTA)

  • SESAR solution 21 (Airport Operations Plan and Network Operations Plan seamless integration)

NCM is subject to continued Industrial Research (IR) and Very Large Scale Demonstration (VLD) activities within the SESAR 2020 programme. This project must ensure that its activities are coordinated with parallel projects working in this area.

In particular, this action follows on from the project PJ24 NCM funded under call H2020-SESAR-2015-2. Consortia applying for this topic must include at least one AU, and may include additional entities provided their role in supporting the demonstration from the AU perspective is adequately justified in the proposal. Applicants should demonstrate how their flying programme will provide the benefits expected to be derived from the project.

In current operations, AUs participate in DCB processes though NM’s Airport Operators Liaison Office (AOLO), that allows, for example, the coordination of re-routing options for avoiding delays. Slot-swapping processes are also available through NM. In this demonstration, new AU participation concepts will be demonstrated, in order to allow their business priorities to be taken into account in locally-managed DCB processes.

AUs shall perform the demonstrations in collaboration with parallel demonstration projects dealing with the same subject to develop the concept of the demonstrations, participation in activities preparing the trials, participation in periodic follow-up meetings, production of all the documentation related to the demonstration as well as results dissemination and communication activities. Output from the demonstration shall include a report by each participating AU containing a full analysis of the impact of the procedures on AU performance.

Participating AUs will not need to dispatch any flights for the sole purpose of the demonstrations, i.e. participation shall always be through revenue flights. For participating in these trials there is no need for specific avionics equipment beyond what is currently required for operating in European airspace. However, Airline Operations Centre (AOC) processes and systems may need to be updated, and participating AUs may be required to file Extended Flight Plans (EFPL) for the demonstration flights.

Demonstration flights must be in at least one of the following two categories:

  • Flights overflying the area controlled by the following ANSPs:

  • Flight taking off or landing at one of the following airports: Madrid, Barcelona, Palma de Mallorca, Alicante, London Heathrow or Split.

The expected involvement of consortia answering to this open call shall be in accordance to the following requirements:

  • The consortium shall work in collaboration with other demonstration project on NCM all along the project including preparation of the trials. This expected support includes collaboration for developing the concept of the demonstrations, participation in activities preparing the trials, periodic follow-up meetings, support for the production of all the documentation related to the demonstration, as well as participation in the demonstration dissemination and communication activities. Output from the demonstration shall include a report by each participating AU containing a full analysis of the impact of the procedures on AU performance.

  • Consortia shall provide to the ANSP relevant data from their demonstration flights for the operational evaluation of the performance of the concepts under demonstration. These data may include, among others, questionnaires or other feedback by airline staff (flight-crews and/or Airline Operations Centre (AOC) personnel), fuel burn data (potentially including suitably aggregated and de-identified FDR data), scheduling and punctuality data and descent efficiency data.

    Participation in advanced Target Times (TT) management demonstration concepts shall be optional. AUs submitting bids to this call should specify whether their offer includes their participation in the demonstration of TT management concepts, which will be considered an added value in the evaluation of proposals. AUs participating in the demonstration of TT management concepts shall be required to operate flights fully in accordance with the concept being demonstrated (e.g. potentially by flying at a Cost Index (CI) different from the AU’s preferred CI or rejecting a tactical path-shortening instruction for the purpose of complying with an assigned TT).

Expected Impact:

The demonstration will pave the way for implementing concepts from the PCP Air Traffic Management (ATM) NCM functionality, which is a cornerstone of the future performance-driven ATM environment in Europe. The objective is to ensure cost-efficiency and capacity performance goals are met while at the same time AU’s operational needs and requirements are fulfilled. Results of the demonstration should quantify performance improvements resulting from the demonstration flights, using, as a minimum, relevant KPAs from the performance framework defined in the ATM Master Plan.

Topic conditions and documents

Please read carefully all provisions below before the preparation of your application.

  1. List of countries and applicable rules for funding: described in part A of the General Annexes of the General Work Programme.
    Note also that a number of non-EU/non-Associated Countries that are not automatically eligible for funding have made specific provisions for making funding available for their participants in Horizon 2020 projects. See the information in the Online Manual.

     
  2. Eligibility and admissibility conditions: described in part B and C of the General Annexes of the General Work Programme and in the SJU Annual Work Programme.

    Proposal page limits and layout: Please refer to Part B of the SJU proposal template in the electronic submission system
     
  3. Evaluation

    3.1  Evaluation criteria and procedure, scoring and threshold: described in the SJU Annual Work Programme

    3.2 Submission and evaluation process: Guide to the submission and evaluation process

          
  4. Indicative timetable for evaluation and grant agreement:

    Information on the outcome of single-stage evaluation: maximum 5 months from the deadline for submission.
    Signature of grant agreements: maximum 8 months from the deadline for submission.

     
  5. Provisions, proposal templates and evaluation forms for the type(s) of action(s) under this topic:

    Innovation Action:

    Specific provisions and funding rates
    Proposal templates are available after entering the submission tool below.
    Standard evaluation form 
    SJU Model Grant Agreement
     
    Annotated Grant Agreement


     
  6. Additional provisions:

    Horizon 2020 budget flexibility
    Classified information
    Technology readiness levels (TRL) – where a topic description refers to TRL, these definitions apply.


     
  7. Open access must be granted to all scientific publications resulting from Horizon 2020 actions, and proposals must refer to measures envisaged. Where relevant, proposals should also provide information on how the participants will manage the research data generated and/or collected during the project, such as details on what types of data the project will generate, whether and how this data will be exploited or made accessible for verification and re-use, and how it will be curated and preserved.

    This topic participates per default in the open access to research data pilot which aims to improve and maximise access to and re-use of research data generated by projects:

    - The pilot applies to the data needed to validate the results presented in scientific publications. Additionally, projects can choose to make other data available for open access and need to describe their approach in a Data Management Plan (to be provided within six months after the project start).

    - Note that the evaluation phase proposals will not be evaluated more favourably because they are part of the Pilot, and will not be penalised for opting out of the Pilot.

    - Projects can at any stage opt-out of the pilot.

    The legal requirements for projects participating in this pilot are in the article 29.3 of the Model Grant Agreement.
    Further information on the Open Research Data Pilot is made available in the H2020 Online Manual.
     
  8. SJU Additional documents:

     
    ER/VLD Call Technical Specifications
    SJU Annual Work Programme

    ATM Master Plan
    Project Execution Guidance for SESAR 2020 VLD (VLD1)
    Horizon 2020 Rules for Participation
    Horizon 2020 Regulation of Establishment
    Horizon 2020 Specific Programme  

 

Additional documents

  • SPD 2017 en
  • Frequently Asked Questions en
  • Frequently Asked Questions Batch II en
  • Flash Info Call en

Submission Service

No submission system is open for this topic.

Get support

SESAR JU Call Helpdesk: info-call@sesarju.eu


H2020 Online Manual your online guide on the procedures from proposal submission to managing your grant.

Participant Portal FAQ – Submission of proposals.

National Contact Points (NCP) - 
contact your NCP for further assistance.

Research Enquiry Service
– ask questions about any aspect of European research in general and the EU Research Framework Programmes in particular.

Enterprise Europe Network
– contact your EEN national contact for advice to businesses with special focus on SMEs. The support includes guidance on the EU research funding.

IT Helpdesk
- contact the Participant Portal IT helpdesk for questions such as forgotten passwords, access rights and roles, technical aspects of submission of proposals, etc.

Contact the EIT for further assistance related to the call, topics and the content of proposals via the Contact Page on the EIT website.

Ethics – for compliance with ethical issues, see the Participant Portal and Science and Society Portal

European IPR Helpdesk
assists you on intellectual property issues

CEN
and CENELEC, the European Standards Organisations, advise you how to tackle standardisation in your project proposal. Contact CEN-CENELEC Research Helpdesk at research@cencenelec.eu.

The European Charter for Researchers and the Code of Conduct for their recruitment


Partner Search Services
help you find a partner organisation for your proposal