Research & Innovation - Participant Portal

Search

TOPIC : Smart Cities and Communities solutions integrating energy, transport, ICT sectors through lighthouse (large scale demonstration - first of the kind) projects

Topic identifier: SCC-01-2014
Publication date: 11 December 2013

Types of action: IA Innovation action
DeadlineModel:
Opening date:
single-stage
11 December 2013
Deadline: 07 May 2014 17:00:00

Time Zone : (Brussels time)
  Horizon 2020
Topic Description
Scope:

Specific Challenge: The EU policy and regulatory framework in the sectors of energy, transport and ICT supports the development of sectoral solutions, i.e. solutions with a limited degree of integration. However, for successful and accelerated implementation in real environments such as urban ones - that also have to take into account local specificities the test of integrated measures will pave the way for faster market roll-out of technologies. The key challenges for Smart Cities and Communities are to significantly increase the overall energy efficiency of cities, to exploit better the local resource both in terms of energy supply as well as through the demand side measures. This will imply the use of energy efficiency measures optimising at the level of districts, the use of renewables, the sustainability of urban transport and the needed drastic reduction of greenhouse gas emissions in urban areas - within economically acceptable conditions - while ensuring for citizens better life conditions: lower energy bills, swifter transport, job creation and as a consequence a higher degree of resilience to climate impacts (e.g. urban heat islands effects) etc.

Scope:To identify, develop and deploy replicable, balanced and integrated solutions in the energy, transport, and ICT actions through partnerships between municipalities and industries.

These solutions at the intersection of the three sectors will have a holistic approach and are still facing first mover risk. These will be the lighthouse projects as identified by the Communication on Smart Cities and Communities. Lighthouse projects will target primarily large scale demonstration of replicable SCC concepts in city context where existing technologies or very near to market technologies (TRL 7 and more, see part G of the General Annexes) will be integrated in an innovative way.

The proposals should address the following main areas:

         (Nearly zero) or low energy districts: through the integration and management of: i) the supply of energy with predominant exploitation of local resources (e.g. waste heat, renewables, storage) and the active participation of consumers (e.g. use of aggregators); ii) the cost-effective refurbishment of existing buildings without significant disruption for tenants (use of sustainable materials) with a special focus on residential buildings  iii) the cross-cutting ICT solutions for the design and overall management of energy/ transport systems  

         Integrated Infrastructures: through the integration of physical infrastructures such as core networks, street scenes, lighting, industrial sites etc to create new forms of value through re-use and repurposing. This should lead to quantifiable benefits such as reduction of capital /operational expenditure as well as reduced carbon / energy footprints. This might also imply exploitation of synergies between requirements for smart grids, broadband infrastructures and in general poly networks (eg district heating and cooling).

         Sustainable urban mobility: through the integration of energy/ fuelling infrastructure with vehicle fleets powered by alternative energy carriers for public and private transport, including logistics and freight-distribution. Implications on energy management, and in the case of electromobility, the impact on the electricity grid, of the deployment of high numbers of vehicles and/or the alternative fuel blends performance must be assessed. 

The proposed proposals should address in addition to the main areas presented above a strategy that addresses appropriate enabler actions to support the commercial exploitation of the proposal. This includes (indicative list): commitment of authorities (even if changes of politicians/ majority, in the course of the project); citizens' engagement and empowerment; optimising policy and regulatory frameworks; open, consistent data and performance measurements; dissemination and unlocking the market potentials worldwide.

According to the Communication on Smart Cities and Communities the light house projects should look for creating partnerships between industries, academics and cities, empower citizens and ensure the replicability of the solutions, ensure the funding from various sources[1].

Therefore each project should:

  • Be realised in 2 – 3 cities or communities (light house cities or communities);
  • include industry, city planning authorities which should also reflect the view of the consumer organisations, research community, local Small and Medium Size Companies (SMEs);
  • In addition each project should co-involve 2 - 3 follower cities i.e. cities willing to contribute to the process though the replication of solutions at the end of the project and having access to the knowhow and results of the project and a privileged contact with the project's partners. The involvement of the follower cities should be relevant (e.g. participating in definition of user requirements and methodology of transferability of solutions, data collection etc.).  The follower cities should aim at improving their energy performance or the share of use of renewables (e.g. 60% reduction of primary energy for buildings, 20 - 30 % RES use for electricity as well as for heating and cooling). EU geographical coverage conditions should be also applied.
  • Ensure that all proposed activities are a part of ambitious urban plan. These activities should also lead to the development of integrated urban plans. For the lighthouse cities or communities these plans should be finalised (e.g. those compiled for the Covenant of Mayors, Sustainable Energy Action Plans, plans committed under the Green Digital Charter etc., but without limiting to this list of initiatives). The urban plan shall integrate buildings planning, energy networks, ICT, transport/mobility planning; additional issues may be addressed as well if relevant for the city. These plans shall be submitted with the proposal as a supporting document(s).
  • In order to ensure the success of the lighthouse projects, the funding for the other parts of the programme or initiative in which the lighthouse projects are embedded should be secured from other sources, preferably private ones, but also other EU funding sources (European Structural and Investment (ESI) funds for example), national or regional funding.
  • Projects should demonstrate and validate attractive business plans that allow large scale replication of fast economic recovery in cities of varying degrees of economic conditions (from very poor to very rich), varying sizes but significant urban areas  and varying climatic conditions to ensure high impact and replication potential .
  • The industrial partners and municipality authorities should engage in replicating successful demonstration in their own and other cities, notably 'follower cities'; the replication plans are compulsory and are part of the evaluation.
  • Consortia must have a clearly defined structure with roles and responsibilities properly spelled out for all involved entities.

Besides economic sustainability, proposals must also commit to scientific and technical requirements in support to reliability:

  • Open and consistent data and interoperability of solutions in order to avoid locked –in customers.
  • Contribution to common data collection systems (e.g. as those developed by European Commission under SCC2 of this Work Programme), measurement and disclosure methodology, in order to facilitate a common footprint calculation methodology and other metrics (especially for energy saving; CO2 reductions, financial savings, number of jobs created, environmental impact etc.).
  • The performance monitoring should last for a period of at least 2 years. Longer term commitment (e.g. 5 years) will give an added value to the proposal. Consortia should develop an integrated protocol for monitoring energy, infrastructure, mobility and governance practices in the lighthouse projects, enabling documentation of improved performance over short and long term periods. The monitoring protocol should be robust and viable also after the end of the project, supporting and increasing municipal capacity over time Participants may be asked to introduce performance data into existing data bases (CONCERTO technical monitoring data base).

"The grant will be composed of a combination of the reimbursement of eligible costs, and flat rate financing determined on the basis of unit costs only for the building-related demonstration activities. For more detail on the calculation method please refer to the document under the following link, article 6.2 of the document: http://ec.europa.eu/research/participants/data/ref/h2020/grants_manual/amga/h2020-amga_en.pdf "

The building components of the proposals will be supported through the unit cost/m⊃2;.

The Commission considers that proposals requesting a contribution from the EU of between EUR 18 to 25 million would allow this specific challenge to be addressed appropriately. Nonetheless, this does not preclude submission and selection of proposals requesting other amounts.

Expected Impact:

The proposals are expected to have the impacts described below:

  • deploy wide-scale, innovative replicable and integrated solutions in the energy, transport, and ICT;
  • trigger large scale economic investments with the repayment of implementation costs in acceptable time lines (to facilitate the bankability of the projects);
  • increase the  energy efficiency of districts and of cities and foster the use of renewables and their integration energy system and enable active participation of consumers;
  • increase mobility efficiency with lower emissions of pollutants and CO2;
  • reduce the energy costs;
  • decarbonise the energy system while making it more secure and stable;
  • create stronger links between cities in Member States with various geographical and economical positions through active cooperation.

It is envisaged that the proposals will also bring societal benefits:

  • reduction of energy bills for all actors and especially for citizens and public authorities;
  • Increase quality of life by creating  local jobs (that cannot be delocalised) in cities;
  • Increase air quality.

Type of action: Innovation Actions

[1] http://ec.europa.eu/energy/technology/initiatives/doc/2012_4701_smart_cities_en.pdf

Topic conditions and documents

Please read carefully all provisions below before the preparation of your application

 

 

1. List of countries and applicable rules for funding: described in part A of the General Annexes of the General Work Programme.

2. Eligibility and admissibility conditions: described in part B and C of the General Annexes of the General Work Programme

3. Evaluation

3.1 Evaluation criteria and procedure, scoring and threshold: described in part H of the General Annexes of the General Work Programme

3.2 Guide to the submission and evaluation process

4. Proposal page limits and layout: Please refer to Part B of the standard proposal template. Please note that for the topic SCC-01-2014 we have increased the maximum number of pages allowed for submission, including the Buildings Energy Specifications Table (BEST) in part B to 150.

5. Indicative timetable for evaluation and grant agreement:
Information on the outcome of one-stage evaluation: maximum 5 months from the final date for submission.
Signature of grant agreements: maximum 3 months from the date of informing successful applicants.

6. Provisions, proposal templates and evaluation forms for the type(s) of action(s) under this topic:

Innovation Action:

[Specific provisions and funding rates]
[Standard proposal template (administrative forms and structure of technical annex)]
[Standard evaluation form]
[Annotated Model Grant Agreement - General]

7. Additional provisions:

Horizon 2020 budget flexibility
Classified information
Technology readiness levels (TRL) – where a topic description refers to TRL, these definitions apply.
Financial support to Third Parties – where a topic description foresees financial support to Third Parties, these provisions apply.

BEST Table - to be added to the proposal for every type of building

8. Open access must be granted to all scientific publications resulting from Horizon 2020 actions, and proposals must refer to measures envisaged. Where relevant, proposals should also provide information on how the participants will manage the research data generated and/or collected during the project, such as details on what types of data the project will generate, whether and how this data will be exploited or made accessible for verification and re-use, and how it will be curated and preserved.

Additional documents

  • Flash Call Info en
  • Legal basis - Framework Programme H2020 en
  • Legal basis - Specific Programme H2020 en
  • WP H2020 - 1. Introduction en
  • WP H2020 - 10. Secure, clean and efficient energy en
  • WP H2020 - 17. Communication and Dissemination en
  • WP H2020 - 19. General Annexes en
  • BEST Table en
  • FAQ en

Submission Service

No submission system is open for this topic.

Get support

National Contact Points (NCP) – contact your NCP for further assistance.

Enterprise Europe Network – contact your EEN national contact point for advice to businesses with special focus on SMEs. The support includes guidance on the EU research funding.

Research Enquiry Service – ask questions about any aspect of European research in general and the EU Research Framework Programmes in particular.

IT Helpdesk – contact the Participant Portal IT helpdesk for questions such as forgotten passwords, access rights and roles, technical aspects of submission of proposals, etc.

Ethics – to ensure compliance with ethical issues, further information is available on the Participant Portal and on the Science and Society Portal.

European IPR Helpdesk assists you on intellectual property issues.

The European Charter for Researchers and the Code of Conduct for their recruitment

CEN and CENELEC, the European Standards Organisations, advise you how to tackle standardisation in your project proposal. Contact CEN-CENELEC Research Helpdesk at research@cencenelec.eu.

Partner Search Services helps you find a partner organisation for your proposal.

H2020 Funding Guide your online guide on the procedures from proposal submission to managing your grant.