Research & Innovation - Participant Portal

Search

TOPIC : Harmonisation of hydrogen gas trailers

Topic identifier: FCH-04-2-2017
Publication date: 17 January 2017

Types of action: FCH2-CSA Coordination & support action
DeadlineModel:
Opening date:
single-stage
17 January 2017
Deadline: 20 April 2017 17:00:00

Time Zone : (Brussels time)
  Horizon 2020 H2020 website
Pillar: Societal Challenges
Work Programme Year: H2020-JTI-FCH-2017
Work Programme Part: FCH2 Work Plan 2017
Topic Description
Specific Challenge:

Compressed gas truck distribution will initially be the most common way to transport hydrogen from central production sites to consuming facilities. Significant introduction of hydrogen vehicles requires a scale up of two orders of magnitude hydrogen truck distribution. At the same time developing and deploying a high volume trailer is necessary to address both the H2 Mobility market but also the industrial market to increase the volume transported so as to decrease transportation cost and CO2 emissions in a context of increasing fuel cost; to increase customer autonomy and storage footprint and to reduce the HRS investments and ease the ramp up of first stations [1].

Current standards, regulations and safety codes have been developed for a relatively small market volume and deliveries mostly to industrial sites. These standards need to be reviewed, and adapted if needed, to ensure safe, efficient and low-cost hydrogen delivery at larger scales and in residential areas. These regulations and standards need to be harmonised across Europe.

[1] From DeliverHy – Recommendations to Industry (http://www.fch.europa.eu/project/optimisation-transport-solutions-compressed-hydrogen)

Scope:

The following specific issues should be addressed by the project:

  • Identify and quantify the risks associated with compressed hydrogen delivery on a large scale, taking into account the whole chain from filling of trucks at a terminal, driving from supplier to customer and delivery of hydrogen at a retail station or other customers;
  • Propose mitigation actions for the most critical risks;
  • Provide a roadmap for standardisation of compressed hydrogen trucks and interfaces between the truck and the supply and customer sites that balance safety aspects with commercial, environmental and feasibility aspects. This includes a strategy for effective influence on:
    • ISO TC 58/SC3 Gas Cylinders Design;
    • WG 35 Refillable permanently mounted composite tubes for transportation: ISO 17519 CD;
    • WG 32 Refillable composite reinforced tubes of water capacity between 450 L and 3000 L – Design, construction and testing: ISO 11515;
    • WG 27 Gas cylinders of composite construction: ISO 11119-X;
    • ADR - Dangerous Goods Transport.
  • Develop a position paper that, considering actually available European Regulations on max pressure and max quantity of hydrogen transported all over Europe, can propose a modification and derogation proposal to the ARD [2].

To address the issues basic experimentation or simulations may be required, for example to determine optimal flow rates and to optimise ways of equipment handling.

It is expected that the conclusions and results of the project are made public.

Any safety-related event that may occur during execution of the project shall be reported to the European Commission's Joint Research Centre (JRC), which manages the European hydrogen safety reference database, HIAD (dedicated mailbox JRC-PTT-H2SAFETY@ec.europa.eu).

The FCH 2 JU considers that proposals requesting a contribution from the EU of EUR 0.5 million would allow this specific challenge to be addressed appropriately. Nonetheless, this does not preclude submission and selection of proposals requesting other amounts.

A maximum of 1 project may be funded under this topic.

Expected duration: 3 years

[2] ARD (ADR): European agreement on the international carriage of dangerous goods on road

Expected Impact:

The following impacts are expected as a result of the PNR activities:

  • Deeper knowledge of the risks associated with compressed hydrogen delivery on a large scale and the mitigation actions for the most critical risks, ensuring that risks related to distribution during the hydrogen market development phase are minimised;
  • Harmonization of hydrogen distribution with high pressure trucks in the current standards, regulations and safety codes, making possible by the end of the project the distribution of hydrogen with high pressure trucks in Europe with the same framework or regulation in all member states
  • The project shall provide evidences of the reduced cost in the hydrogen value chain due to increased standardisation.
Topic conditions and documents

Please read carefully all provisions below before the preparation of your application.

  1. List of countries and applicable rules for funding: described in part A of the General Annexes of the General Work Programme.
    Note also that a number of non-EU/non-Associated Countries that are not automatically eligible for funding have made specific provisions for making funding available for their participants in Horizon 2020 projects. See the information in the Online Manual.

     
  2. Eligibility and admissibility conditions: described in part B and C of the General Annexes of the General Work Programme.
    The following exceptions apply (see 'chapter 3.3. Call management rules' from the FCH2 JU 2017 Work Plan and specific topic description):
    - “For some, well-identified topics it is therefore duly justified to require as an additional condition for participation that at least one constituent entity of the Industry Grouping or Research Grouping is among the participants in the consortium”;
    - “For all Innovation Activities, an additional eligibility criterion has been introduced to limit the FCH 2 JU requested contribution”.

    Proposal page limits and layout: Please refer to Part B of the FCH2 JU proposal template.

     
  3. Evaluation

    3.1  Evaluation criteria and procedure, scoring and threshold: described in part H of the General Annexes of the General Work Programme.

    3.2 Submission and evaluation process: Guide to the submission and evaluation process

          
  4. Indicative timetable for evaluation and grant agreement:

    Information on the outcome of evaluation: maximum 5 months from the deadline for submission.
    Signature of grant agreements: maximum 8 months from the deadline for submission.

     
  5. Provisions, proposal templates and evaluation forms for the type(s) of action(s) under this topic:

Coordination and Support Action:

 

       6. Additional provisions:

Horizon 2020 budget flexibility
Classified information
Technology readiness levels (TRL) – where a topic description refers to TRL, these definitions apply.
 

       7. Open access must be granted to all scientific publications resulting from Horizon 2020 actions, and proposals must refer to measures envisaged. Where relevant, proposals should also provide information on how the participants will manage the research data generated and/or collected during the project, such as details on what types of data the project will generate, whether and how this data will be exploited or made accessible for verification and re-use, and how it will be curated and preserved. See Part L of the General Annexes of the General Work Programme.

 

      8. Additional documents:

FCH2 JU 2017 Work Plan
FCH2 JU Multi Annual Work Plan 
FCH2 JU – Regulation of establishment
Horizon 2020 Regulation of Establishment
Horizon 2020 Rules for Participation
Horizon 2020 Specific Programme

 

Additional documents

  • Flash-call Info en

Submission Service

No submission system is open for this topic.

Get support

H2020 Online Manual your online guide on the procedures from proposal submission to managing your grant.

Participant Portal FAQ – Submission of proposals.

National Contact Points (NCP) - 
contact your NCP for further assistance.

Research Enquiry Service
– ask questions about any aspect of European research in general and the EU Research Framework Programmes in particular.

Enterprise Europe Network
– contact your EEN national contact for advice to businesses with special focus on SMEs. The support includes guidance on the EU research funding.

IT Helpdesk
- contact the Participant Portal IT helpdesk for questions such as forgotten passwords, access rights and roles, technical aspects of submission of proposals, etc.

FCH2 JU members:
Industry Grouping, Hydrogen Europe

Research Grouping, N.ERGHY

FCH2 JU Programme Office, Helpdesk: fch-projects@fch.europa.eu

Ethics
– for compliance with ethical issues, see the Participant Portal and Science and Society Portal

European IPR Helpdesk
assists you on intellectual property issues

CEN
and CENELEC, the European Standards Organisations, advise you how to tackle standardisation in your project proposal. Contact CEN-CENELEC Research Helpdesk at research@cencenelec.eu.

The European Charter for Researchers and the Code of Conduct for their recruitment


Partner Search Services
help you find a partner organisation for your proposal