Research & Innovation - Participant Portal

Search

TOPIC : Efficient and cost-optimised biogas-based co-generation by high-temperature fuel cells

Topic identifier: FCH-02-7-2018
Publication date: 16 January 2018

Types of action: FCH2-RIA Research and Innovation action
DeadlineModel:
Opening date:
single-stage
16 January 2018
Deadline: 24 April 2018 17:00:00

Time Zone : (Brussels time)
  Horizon 2020 H2020 website
Pillar: Societal Challenges
Work Programme Year: H2020-JTI-FCH-2018
Work Programme Part: H2020-JTI-FCH-2018
Topic Updates
  • 20 August 2018 17:58

    An overview of the evaluation results (flash call info) is now available under the "Additional Documents" section of each topic page.

Topic Description
Specific Challenge:

Biomass can be easily converted to fuel gases rich in CH4, CO, and H2, depending on the biomass treatment in anaerobic digestion, thermochemical conversion, or fermentation. The direct use of biomass-derived fuel in high-temperature fuel cells for combined heat and power (CHP) promises significantly higher electrical efficiencies of 55 to 60% and ultra-clean exhausts. Unlike for gas grid injection, the CO2 content in biogas does not have to be removed from the fuel stream, but can on the contrary be used as reforming agent (dry reforming) and increase the electrical efficiency. This greatly simplifies the system layout and avoids the supply of steam for reforming. In addition, separation of leftover bio-CO2 after the CHP generation process will be straightforward and can bring significant benefit to the use of High Temperature Fuel Cells (HTFC) CHP systems in future CO2 valorisation scenarios. For all of these reasons HTFC systems have the potential to achieve technical, environmental and economic advantages relative to currently available biogas conversion technologies.
The use of HTFC is currently being demonstrated in ongoing projects. In particular, the FCH 2 JU funded project DEMOSOFC is demonstrating the use of biogas from a wastewater treatment plant for heat and power production using a HTFC. In this project, the HTFC requires to first clean-up and purify the biogas to grid quality prior to conversion into power and heat. This represents a significant added cost to the overall system, hindering cost-effective exploitation of the technical and environmental advantages of the use of raw biogas in HTFC.
Biogas is primarily methane (CH4) and carbon dioxide (CO2). Depending on its origin, it usually contains small amounts of hydrogen sulphide (H2S), moisture and siloxanes, or also significant amounts of nitrogen in the case of landfill gas. The removal of pollutant and CO2 for the purpose of grid injection is increasingly applied for wastewater treatment plants, which often are located close to the gas grid and present significant volumes of gas. However, biogas from distributed sources such as agricultural waste and manure, or dilute gases like from landfill, are rarely injected. Farms are usually not connected to the gas grid, and in the case of landfill gases, it is rarely economic to concentrate the methane to grid quality. In the latter case, it is even common practice to add methane to the biogas to flare(burn) the gas in order to prevent the methane to vent directly to the atmosphere. This transforms a primary fuel in an energy consumer.
HTFC are in principle able to able to exploit the contained CO2 to increase the conversion efficiency by using the CO2 as reforming agent. The so-called dry-reforming process is replacing then either steam-methane reforming or the catalytic partial oxidation commonly used in fuel cell systems. HTFC as electrochemical energy conversion devices have a high resilience to inert gases such as nitrogen compared to combustion engines. The fuel cell exploits directly the chemical energy contained in the fuel without a combustion process. Independent from above elements, the pollutants such as sulphur components, halogens and siloxanes still need to be removed.
The challenges addressed is to perform the pollutant removal for the HTFC in a simple, low-cost, modular manner, capable to operate on multiple feedstock sources of biogas (organic fraction of urban waste, agricultural/farming residues, landfill, etc.). The removal needs to be able to cope with seasonal or geographical variations, and to reduce significantly complexity and costs related to biogas pre-processing. On the level of system integration, the appropriate conditions for the use of dry-reforming instead of steam reforming with a minimal changes with respect to standard HTFC systems is a further challenge, as only limited customisation can be economically justified. Furthermore, HTFC system operation strategies need to be elaborated to allow system operation with dilute fuels, again with ideally no hardware changes with respect to standard HTFC systems.

Scope:

The scope of the project is to design and engineer an integrated biogas-fed fuel cell system architecture with minimal gas pre-processing. The aspects of low-cost pollutant removal and thermal integration of the system to increase the system efficiency by using the inherent CO2 of the biogas should be the focus of the project. Operation strategies allowing the system to use dilute gases should also be studied.
Proposals submitted under this topic should focus on the conceptual and detailed design of a HTFC-CHP system optimised for raw biomass-derived gaseous fuel operation in a real environment, processing different types of biogas feedstock, coping with gas composition fluctuations and pollutants. More than one type of biogas should be considered, especially considering applications where conversion to bio methane and injection into the natural gas grid is not feasible. In the design, gas fuel pre-processing should be kept to the absolute minimum, integrating potentially processing catalysts for pollutant removal and fuel pre-reforming. The interface between the raw (2nd generation) biomass processing reactor and the fuel cell hot module should be a unique, one-stop appliance that is able to process the full range of bio fuel-gas compositions expected from a given bio-waste valorisation chain. The output gas has to match the requirements of the fuel cell module optimized for bio fuel-gas conversion.
To this effect, targeted tests on clean up, reforming and HTFC materials and components (catalysts, supports, adsorbents, membranes, cells/stacks), where not available from the state-of-the-art, are within the scope of the project. They aim to provide pollutant tolerance level of the critical components of a HTFC system and will provide the base for the final design specifications of the gas cleaning unit. The impact of dry reforming on anode electrodes, to avoid auxiliary steam supply in the system should be evaluated at laboratory scale and reported according to procedures developed in relevant FCH 2 JU projects.
The one-stop bio fuel-gas processing stage should take into account outcomes of previous projects investigating this coupling, such as DEMOSOFC. Where applicable, thermal integration between the FC module and the bio fuel-gas generation should be considered in the system architecture to maximize process efficiency.
Developments that directly modify and adapt the stack and/or reformer to increase their pollutant tolerance levels should only be planned where reduced total cost of ownership for the generated electricity can be expected. This is always to be analysed in comparison with the current base method of purification for pollutant removal.
The design of full-scale FC-CHP units for installation at biogas production sites should be addressed in the project. This should include pathways for the use of bio-CO2 produced. The selection of the size of full-scale should be based on existing market analysis with clear indications of the technical and economic advantages in comparison to both other power conversion technologies (e.g. combustion engines) and gas grid injection.
TRL at start: 3 and TRL at end: 5-6.
At least 2 HTFC manufacturers should participate to open an opportunity to exploit the built-up competences in biogas pre-treatment independently from the FC system manufacturer, offering a business opportunity for specialised actors.
Any safety-related event that may occur during execution of the project shall be reported to the European Commission's Joint Research Centre (JRC) dedicated mailbox JRC-PTT-H2SAFETY@ec.europa.eu, which manages the European hydrogen safety reference database, HIAD.
Test activities should collaborate and use the protocols developed by the JRC Harmonisation Roadmap (see section 3.2.B "Collaboration with JRC – Rolling Plan 2018"), in order to benchmark performance of components and allow for comparison across different projects.


The FCH 2 JU considers that proposals requesting a contribution of EUR 1.5 million would allow this specific challenge to be addressed appropriately. Nonetheless, this does not preclude submission and selection of proposals requesting other amounts.
A maximum of 1 project may be funded under this topic.
Expected duration: 2 years

Expected Impact:

The use of HTFC-CHP systems is well aligned with European energy and waste related policies. The EC communication on “The role of waste energy in the circular economy” [21] prioritises the use of advanced conversion technologies to obtain bio-derived gas especially for the treatment of biodegradable waste. The expected impact of biomass driven HTFC is therefore very high being a very significant entry market for the deployment of renewable sources-driven HTFC in the medium industrial scale. Based on the modularity of fuel cells, they will likely address initially smaller, distributed power ranges, before addressing at a later stage the large quantities of low quality gases of landfill and retired coal fields.
To profit from this opportunity, the specific impacts the proposed design should achieve are then:

  • Increased conversion efficiency of waste-derived fuel to electricity and heat, with electrical efficiency above 53% for ordinary biogas;
  • Energetic exploitation and reduced methane consumption for strongly dilute biogas sources, providing a net electricity output;
  • a modular biogas processing design that can be easily retrofitted to existing biogas sources;
  • an opportunity for European gas component manufacturers to provide flexible gas cleaning modules to several FC system manufacturers, in Europe and world-wide;
  • a gas cleaning system eliminating external auxiliary reactant supplies and coping with a variety of biomass-derived fuel-gases, ideally operable in flexible fuel mode;
  • standardization of the clean-up section to address different types of biomass-derived fuel gases, leading to compositions acceptable for long-term operation of the optimized fuel cell hot module;
  • validation of dry reforming capability in the fuel cell to improve efficiency and cost-effectiveness of the integrated system;
  • projected cost target of < 3.500 €/kWel fuel cell and gas cleaning system at a production volume of 25 MW p.a.;
  • demonstration of environmental benefits using an LCA;

Footnote [21] Brussels, 26.1.2017 COM(2017) 34 final

Type of action: Research and Innovation Action
The conditions related to this topic are provided in the chapter 3.3 and in the General Annexes to the Horizon 2020 Work Programme 2018– 2020 which apply mutatis mutandis.

Topic conditions and documents

1.   Eligible countries: described in Annex A of the H2020 main Work Programme.

      A number of non-EU/non-Associated Countries that are not automatically eligible for funding have made specific provisions for making funding available for their participants in Horizon 2020 projects. See the information in the Online Manual.

 

2.   Eligibility and admissibility conditions: described in Annex B and Annex C of the H2020 main Work Programme.

 The following exception applies (see 'chapter 3.3. Call management rules' from the FCH2 JU 2018 Work Plan and specific topic description):

- "For all Innovation Actions, an additional eligibility criterion has been introduced to limit the FCH 2 JU requested contribution"

     Proposal page limits and layout: Please refer to Part B of the proposal template in the submission tool below.

 

3.   Evaluation:

  • Evaluation criteria, scoring and thresholds are described in Annex H of the H2020 main Work Programme.
  • Submission and evaluation processes are described in the Online Manual.
     

4.   Indicative time for evaluation and grant agreement:
      Information on the outcome of evaluation: maximum 5 months from the deadline for submission.
      Signature of grant agreements: maximum 8 months from the deadline for submission.

 

5.   Proposal templates, evaluation forms and model grant agreements (MGA):

FCH JU Research and Innovation Action (FCH-RIA)

Specific rules and funding rates
Proposal templates are available after entering the submission tool below.
Standard evaluation form
FCH JU MGA - Multi-Beneficiary
H2020 Annotated Grant Agreement

FCH JU Innovation Action (FCH-IA)

Specific rules and funding rates
Proposal templates are available after entering the submission tool below.
Standard evaluation form
FCH JU MGA - Multi-Beneficiary
H2020 Annotated Grant Agreement

FCH JU Coordination and Support Action (FCH-CSA)

Specific rules and funding rates
Proposal templates are available after entering the submission tool below.
Standard evaluation form
FCH JU MGA - Multi-Beneficiary
H2020 Annotated Grant Agreement

 

6.   Additional requirements:

      Horizon 2020 budget flexibility
      Classified information
      Technology readiness levels (TRL)
      Financial support to Third Parties
 

Members of consortium are required to conclude a consortium agreement, in principle prior to the signature of the grant agreement.

7.   Open access must be granted to all scientific publications resulting from Horizon 2020 actions.

Where relevant, proposals should also provide information on how the participants will manage the research data generated and/or collected during the project, such as details on what types of data the project will generate, whether and how this data will be exploited or made accessible for verification and re-use, and how it will be curated and preserved.

Open access to research data
The Open Research Data Pilot has been extended to cover all Horizon 2020 topics for which the submission is opened on 26 July 2016 or later. Projects funded under this topic will therefore by default provide open access to the research data they generate, except if they decide to opt-out under the conditions described in Annex L of the H2020 main Work Programme. Projects can opt-out at any stage, that is both before and after the grant signature.

Note that the evaluation phase proposals will not be evaluated more favourably because they plan to open or share their data, and will not be penalised for opting out.

Open research data sharing applies to the data needed to validate the results presented in scientific publications. Additionally, projects can choose to make other data available open access and need to describe their approach in a Data Management Plan.

Projects need to create a Data Management Plan (DMP), except if they opt-out of making their research data open access. A first version of the DMP must be provided as an early deliverable within six months of the project and should be updated during the project as appropriate. The Commission already provides guidance documents, including a template for DMPs. See the Online Manual.

Eligibility of costs: costs related to data management and data sharing are eligible for reimbursement during the project duration.

The legal requirements for projects participating in this pilot are in the article 29.3 of the Model Grant Agreement.

8.   Additional documents

FCH JU Work Plan
FCH2 JU Multi Annual Work Plan 
FCH2 JU – Regulation of establishment
H2020 Regulation of Establishment
H2020 Rules for Participation
H2020 Specific Programme
 

Additional documents

  • Flash call info en

Submission Service

No submission system is open for this topic.

Get support

H2020 Online Manual is your guide on the procedures from proposal submission to managing your grant.

Participant Portal FAQ – Submission of proposals.

National Contact Points (NCP) - contact your NCP for further assistance in your national language(s).

Research Enquiry Service – ask questions about any aspect of European research in general and the EU Research Framework Programmes in particular.

Enterprise Europe Network – contact your EEN national contact for advice to businesses with special focus on SMEs. The support includes guidance on the EU research funding.

IT Helpdesk - contact the Participant Portal IT helpdesk for questions such as forgotten passwords, access rights and roles, technical aspects of submission of proposals, etc.

Ethics – for compliance with ethical issues, see the Online Manual and Science and Society Portal

European IPR Helpdesk assists you on intellectual property issues

CEN and CENELEC, the European Standards Organisations, advise you how to tackle standardisation in your project proposal. Contact CEN-CENELEC Research Helpdesk at research@cencenelec.eu

The European Charter for Researchers and the Code of Conduct for their recruitment

Partner Search Services help you find a partner organisation for your proposal.