Innovation and Networks Executive Agency

Priority Project 27 Priority Project 27

INEA ceased operations on 31 March 2021. The European Climate, Infrastructure and Environment Executive Agency (CINEA) was established on 1 April 2021 to take over its legacy portfolio as well as additional EU funding programmes.
"Rail Baltica" axis: Warsaw-Kaunas-Riga-Tallinn-Helsinki

Click map to view enlarged version

 PROJECT DESCRIPTION

 

“Rail Baltica” is a strategic and sustainable rail project linking four new EU Member States of the EU - Poland, Lithuania, Latvia and Estonia - as well as Finland. In addition, it is the only rail connection between the three Baltic States themselves to Poland and the rest of the EU. To the north, Helsinki is connected by rail ferry services across the Gulf of Finland which can form a “bridge” to the countries of the Nordic Triangle (PP12). The length of the current track is approximately 1,200 km by the most direct existing route from Tallinn to Warsaw. A variety of track and operating systems are currently in use: single and double track, electrified and nonelectrified (of which single track non-electrified is the most common system). The line passes through a variety of different terrain - urban areas such as the cities of Białystok, Kaunas and Riga, and rural areas such as in the Podlaskie region of northeast Poland and southern Lithuania, as well as northern Latvia and the south of Estonia. “Rail Baltica” also connects three major Baltic seaports: Helsinki, Tallinn and Riga and has a short rail connection to a fourth - Klaipeda.

 

Mr Pavel Telička has served as European Coordinator for this Priority Project since July 2005.

Learn more about the active projects managed by the Agency that make up Priority Project 27:

As this website continues to be updated and enhanced, more project information will be added as it becomes available!

Preliminary design and operations studies for Rail Baltica railway line Latvian section

Spatial planning and technical studies for Rail Baltic (Estonian section)

1) Reconstruction/upgrading: cross-border section north Valmiera-Valka and cross-border section south Jelgava-LT border 2) Reconstruction/upgrading Sigulda-Valmiera

Studies for a European gauge line (Latvian studies)

Studies for Rail Baltica, Lithuanian part

1) Upgrading of existing railway line on the cross-border section PL/LT state border-Marijampole 2) Cross-border section Siauliai - LV border. Reconstruction/upgrading 

Cross-border section Tartu-Valga railway reconstruction / upgrading

Studies for a European gauge line for Rail Baltica (Estonian section)

Preparation of modernisation and extension of Warsaw railway junction

Preparation of territorial planning documents and technical designs for Rail Baltica link from Lithuanian/Polish border to Kaunas