Innovation and Networks Executive Agency

Rail 2011-IT-93097-P

Technological upgrading of Turin–Padua line: implementation of technologies for the efficiency of movement in the Milan Railway Hub

Programme:

The Action is part of Global Project addressing the upgrade of the command and control system of the Torino–Milano–Verona–Padova railway line, part of the Mediterranean corridor.

In particular, the Action addresses the deployment of a remote control and command system covering the area of Milan.

The main Action's tasks are:

  • The preparation of 4 remote sites, including the installation of remote controlled devices;
  • The installation of 5 computer-based multi-station interlockings (ACCM) and of 1 computer-based supervision centre (SCCM) at the control and command centre of Milano Greco Pirelli;
  • The installation of a power supply and of an integrated circuit protection system for the provision of energy on all 4 remote sites and along the line, and
  • The deployment of optical fibre and G-Ethernet network connecting the remote sites with the control and command centre at Milano Greco Pirelli.

 


 

This project has been completed.

 

Budget:

 

National budget:

 

€31,591,201

Total project cost covered by this Decision:

 

€36,591,201

Percentage of EU support:

 

Works: 13.66%

EU contribution:

 

€5,000,000

 

Download the Info Sheet about this project:

/inea/en/file/fichenew2011-it-93097-pfinal.pdf.pdf

 

This project was also the subject of a press release issued by the Agency.

2011-IT-93097-P

Click map to view enlarged version

Member States involved:

Italy

 

Implementation schedule:

Start date: June 2012

End date: December 2014

 

Beneficiary:

 Italian Ministry of Infrastructures and Transport

 

Implementing body:

 Rete Ferroviaria Italiana

 

Additional information:

 European Commission, DG MOVE


 See projects by country or transport mode