Preparation of Detailed Design and Tender Documentation (Infrastructure and Signalling) for the Implementation Works of the Railways Line Szekesfehervar-Boba

Programme:

This project, part of Priority Project 6 (railway axis Lyon-Trieste-Divaèa/Koper-Divaèa-Ljubljana-Budapest-Ukrainian border), aims at upgrading the the Székesfehérvár to Boba railway line. The main objective is to prepare the upgrade of the track to160 km/h (to 80-120 km/h on the Veszprém-Ajka line section), the installation of ETCS Level 2 and the reconstruction of the stations in order to enable higher track capacity and provide enhanced safety standards for passengers.

 

The project encompasses the following activities:

  • Preparation of technical design for construction of track, structure, tunnel, catenary and noise protection works
  • Preparation of tender drawings for signalling, telecommunication, point heating, outdoor and lighting works
  • Preparation of tender documentation for signalling, telecommunication work of Székesfehérvár to Boba railway line, track, structure, catenary and noise protection works for the Székesfehérvár – Veszprém line section, track, structure, tunnel, catenary and noise protection works for Veszprém – Ajka line section and track structure, catenary and noise protection works for Ajka-Boba line section

 

 

The project has been completed.

 

Budget:

National budget:

 

€4,000,000

Total project cost covered by this Decision:

 

€8,800,000

Percentage of EU support:

 

Studies: 50%

EU contribution:

 

€4,000,000

 

Download the Info Sheet about this project:

 .pdf (282.6 KB)

 

Click map to view enlarged version

Member States involved:

Hungary

 

Implementation schedule:

Start date: November 2006

End date: December 2010

 

Beneficiary:

 Ministry of National Development

 

Implementing body:

 National Infrastructure Developing Co. Ltd. (NIF)

 

Additional information: