Innovation and Networks Executive Agency

Rail 2007-FR-91209-S

Lyon-Turin railway project: French accesses to the Base Tunnel

Programme:

The new freight and passenger rail link between Lyon and Turin, part of Priority Project 6 (railway axis Lyon-Trieste-Divaca/Koper-Divaca-Ljubljana-Budapest-Ukranian border) will act as a key node between both northern and southern Europe (London/Amsterdam/Paris-Milano) and east and west (Lisbon-Budapest). It will considerably shorten travel times for high-speed passenger traffic and provide an environmentally friendly response to the steadily increasing demand for freight transport over the Alps.

 

This project concerns studies on the French access from Lyon to the "Base Tunnel" (section Lyon-Saint Jean de Maurienne). The passenger and freight itinerary will be mixed on the main part of the section, except near Chambéry, where the high speed passenger line will pass through a 15 km tunnel under the Dullin-L'Epine mountains. Freight traffic will avoid the city of Chambéry entirely and will be channelled through the 24 km Chartreuse tunnel.

 

The pre-design studies will look at the alignment of the new railway line (including topographic, geological, geotechnical, technical, environmental, economic, socio-economic studies) and preliminary studies for the connections to existing lines.

 

The project has now been completed.

 

Budget: 

 

National budget:

 

€2,820,000


Action promoter:

 

€1,880,000

Total project cost covered by this Decision:

 

€9,400,000

Percentage of EU support:  

 

Studies: 50%

EU contribution: 

 

€4,700,000

 

Download the Info Sheet about this project:

.pdf (143.3 KB)

Click map to view enlarged version

Member States involved:

France

 

Implementation schedule:

Start date: August 2007

End date: December 2009

 

Beneficiary:

Ministry of Sustainable Development

 

Implementing body:

 Réseau Ferré de France

 

Additional information:

 European Commission, DG MOVE

 


 See projects by country or transport mode