Studies concerning the modernisation of the railway track line Blazovice-Nezamyslice: preliminary design, EIA, geotechnical documentation

Programme:

This project aims at preparing the preliminary design to upgrade the railway section between Blazovice and Nezamyslice with a double-track line, part of Priority Project 23 railway axis Gdañsk-Warszawa-Brno/Bratislava-Wien.

 

The study includes the preliminary design and the geotechnical documentation, assessment of the interoperability requirements and environmental impact assessment for the section Brno-Prerov.

 

The project will contribute to improving safety and interoperability on Priority Project 23, and to increase the maximum line speed up to 160-200 km/h on this section.

 


 

This project has been completed.

 

Budget: 

 

National budget:

 

€2,365,210

Total project cost covered by this Decision:

 

€4,665,210

Percentage of EU support:  

 

Studies: 49.3%

EU contribution: 

 

€2,300,000

 

Download the Info Sheet about this project:

 .pdf (524.7 KB)

Click map to view enlarged version

Member States involved:

Czech Republic

 

Implementation schedule:

Start date: December 2006

End date: December 2009

 

Beneficiary:

Ministry of Transport

 

Implementing body:

Czech Railway Infrastructure Administration (SZDC)

 