Studies concerning the modernisation of the railway track line Blazovice-Nezamyslice: preliminary design, EIA, geotechnical documentation
This project aims at preparing the preliminary design to upgrade the railway section between Blazovice and Nezamyslice with a double-track line, part of Priority Project 23 railway axis Gdañsk-Warszawa-Brno/Bratislava-Wien.
The study includes the preliminary design and the geotechnical documentation, assessment of the interoperability requirements and environmental impact assessment for the section Brno-Prerov.
The project will contribute to improving safety and interoperability on Priority Project 23, and to increase the maximum line speed up to 160-200 km/h on this section.
This project has been completed.
Budget:
National budget:
€2,365,210 |
Total project cost covered by this Decision:
€4,665,210 |
Percentage of EU support:
Studies: 49.3% |
EU contribution:
€2,300,000 |
Download the Info Sheet about this project:
.pdf (524.7 KB)
Member States involved:
Czech Republic
Implementation schedule:
Start date: December 2006
End date: December 2009
Beneficiary:
Implementing body:
Czech Railway Infrastructure Administration (SZDC)