Please note that the listing below is not exhaustive. More project information will be added as this website continues to be enhanced.
Central European Green Corridors - Fast Charging Cross Border Infrastructure for Electric Vehicles, Connecting Austria, Slovakia, Slovenia, Germany and Croatia
Crocodile
Speeding up and facilitating SESAR deployment through convergence between COOPANS and DSNA/4Flight ATM systems
Baltic-Adriatic Core Network Corridor; Design study and Environmental Impact Assessment (EIA) to implement the gap-closure along “Pottendorfer Line” (Vienna–Wiener Neustadt) between “Münchendorf and Wampersdorf” (via Ebreichsdorf)
Studies for the expansion of the trimodal Port of Linz (Priority Axis 18)
Priority TEN-axis No. 17 “Paris–Strasbourg–Munich–Vienna–Bratislava”, section “Salzburg–Vienna”; “Environmental Impact Assessment (EIA) study necessary for the implementation of the gap-closure Salzburg–Steindorf/Straßwalchen”
Priority TEN-axis No. 17 “Paris–Strasbourg–Munich–Vienna–Bratislava”, section “Salzburg–Vienna”; “Environmental Impact Assessment (EIA) study necessary for the implementation of the gap-closure Linz–Wels”
SWIFTLY Green (Sweden-Italy Freight Transport and Logistics Green Corridor)
Preparatory studies and activities of organisational structures of Rail Freight Corridor 5
Study on the implementation and establishment of rail freight corridors including pilot interventions and telematics applications for TSI implementation
RIS Enabled European IWT Corridor Management
CEE goes ECTS
Regional European Electronic Toll Service (REETS TEN)
Accelerating the deployment of advanced FDP capabilities in Europe
High-performance Green Port Giurgiu
LNG Masterplan for Rhine-Main-Danube
Priority Project TEN no. 1 Brenner Base Tunnel – Studies
Pre-study for the Northern Access Line to the Brenner Base Tunnel between Munich (Germany) and Radfeld (Austria)
Future Baltic-Adriatic core network: construction of a rail bridge at Stein crossing river Drau
Studies for the expansion of the trimodal Port of Freudenau/Vienna
Expansion of the tri-modal inland port by land recovery
Pummersdorfer Tunnel
Priority TEN-T axis No. 17 Paris–Strasbourg–Stuttgart–Vienna–Bratislava, Freight train bypass St. Pölten - Western connection
Air traffic management network integration and performance enhancement acceleration
IRIS Europe 3
Facilitating and speeding up ERTMS deployment
Study and implementation of major parts of the Corridor Freight Regulation 913/2010
Works for the St. Polten freight train pass
Lambach–Breitenschützing line improvements and works
Gap closure east of Amstetten Station
Linz Trimodal
Freight Terminal Wolfurt – Planning
Studies on improving the Freight Corridor Concept by using Telematic Applications for Freight, and methods, tools and procedures developed by RNE for rail corridors
Greening European Transportation Infrastructure for Electric Vehicles
FAB CE Implementation of Static Area of Responsibility Scenario
Terminal Wien Inzersdorf - Planning, (PP 17 – Section: Vienna-Salzburg)
Intermodal Terminal Wörgl (TEN-T Priority Project 1 - Section Kufstein-Innsbruck)
Upgrade of locomotives with onboard ETCS equipment
EasyWay, Phase 2
Airborne Datalink Equipment
ERTMS deployment on Corridor B (Stockholm-Naples) Austrian vehicles
ERTMS deployment on Corridor E (Dresden-Constanta) Trackside equipment
ERTMS deployment on Corridor E (Dresden-Constanta) Austrian vehicles
Four-track development of the Western Line, construction project Ybbs-Amstetten, Burgstaller Tunnel (skeleton construction)
Four-track development of the Western Line Vienna-Salzburg: gap closure St. Pölten-Loosdorf (freight rail bypass) bridge construction works
Four-track development of the Western Line Vienna-Linz: Melk railway station
NETLIPSE
Feasibility study on international rail real time traffic monitoring and electronic path request systems
Implementation of River Information Services in Europe - IRIS Europe II
Functional Airspace Block Central Europe - Implementation Plan
EASYWAY
SESAR (Single European Sky ATM Research) - Development Phase
Trans-European Satellite Navigation System (Galileo): Development and validation phase
Priority Project TEN no. 1 Brenner Base Tunnel - Studies
Priority Project TEN no. 1 Brenner Base Tunnel - Works
ERTMS deployment on Corridor B (Stockholm-Naples) - Austrian section
Implementation integrated river engineering project Danube East of Vienna
Works for the modernisation of the cross border section Salzburg–German border
Works and studies for upgrading the Wien-Bratislava railway line (6 sub-projects)
Works for construction of new high speed line between Kundl/Radfeld and Baumkirchen
ERTMS development and consolidation
Equipment of A-Network with ETCS Level 1 Phase 1: Linz-Salzburg and Wels-Passau
Prague-Linz-Maribor rail connection: technical, construction and alignment designs for the two tracks construction in section Werndorf South- Spielfeld (Sentilj)