Innovation and Networks Executive Agency

Search

INEA ceased operations on 31 March 2021. The European Climate, Infrastructure and Environment Executive Agency (CINEA) was established on 1 April 2021 to take over its legacy portfolio as well as additional EU funding programmes.

Search results

  1. The current Action

    the Port of Kokkola will be able to accommodate an adequate number of large-sized vessel in the Deep Port.;;;;;;;; Last modified:  October 2021 The current Action ...

    Anthony MACIEJOWSKI - 15/10/2021 - 17:52

  2. The works will improve the quality of the infrastructure in terms of safety

    thus removing an existing bottleneck and improving connections with both rail and road networks.;;;;;;;; Last modified:  October 2021 The works will improve the quality of the infrastructure in terms of safety ...

    Anthony MACIEJOWSKI - 15/10/2021 - 17:53

  3. MEGA-E also foresees the introduction of 39 multi-modal e-hubs in 10 major cities (park & ride facilities and intermodal nodes

    e-car sharing Last modified:  October 2021 MEGA-E also foresees the introduction of 39 multi-modal e-hubs in 10 major cities (park & ride facilities and intermodal nodes e-logistics or e-buses.;;;;;;;; ...

    Anthony MACIEJOWSKI - 15/10/2021 - 17:53

  4. The Action contributes to the ERTMS Deployment Plan in Netherlands

    the upgrading of the existing cross-border locomotives to Baseline 3 by 2025.;;;;;;;; Last modified:  October 2021 The Action contributes to the ERTMS Deployment Plan in Netherlands ...

    Anthony MACIEJOWSKI - 15/10/2021 - 17:54

  5. In the Port of Tallinn

    reconstruction of access to terminal A Last modified:  October 2021 In the Port of Tallinn the building of a connection between these two terminals as well as a Hazard and Operability Analysis HAZOP study for the Old City Harbour.;;;;;;;; ...

    Anthony MACIEJOWSKI - 15/10/2021 - 17:55

  6. The activities included studies on safety

    000 m3 to 150 Last modified:  October 2021 The activities included studies on safety 000 m3) increasing FSRU.;;;;;;; ...

    Anthony MACIEJOWSKI - 15/10/2021 - 17:55

  7. The main tasks to be performed are the characterisation of current passenger flows

    with a specific focus on safety Last modified:  October 2021 The main tasks to be performed are the characterisation of current passenger flows security and accessibility to transport infrastructures.;;;;;;;; ...

    Anthony MACIEJOWSKI - 15/10/2021 - 17:56

  8. The Action foresees the deployment of 62 charging supply points along TEN-T Core Network Corridors: 57 multi-standard 50 kW fast chargers (27 in Croatia

    of which 13 intermodal locations Last modified:  October 2021 The Action foresees the deployment of 62 charging supply points along TEN-T Core Network Corridors: 57 multi-standard 50 kW fast chargers (27 in Croatia and 5 AC high power chargers at intermod ...

    Anthony MACIEJOWSKI - 15/10/2021 - 17:56

  9. The overall objective of the “ADRI-UP” Action was to upgrade the MoS between the ports of Trieste and Ancona

    in Greece.;;;;;;;; Last modified:  October 2021 The overall objective of the “ADRI-UP” Action was to upgrade the MoS between the ports of Trieste and Ancona ...

    Anthony MACIEJOWSKI - 15/10/2021 - 17:56

  10. The Action consists in upgrading the Armamento quay

    within the port service area.;;;;;;;; Last modified:  October 2021 The Action consists in upgrading the Armamento quay ...

    Anthony MACIEJOWSKI - 15/10/2021 - 17:57

Pages