Innovation and Networks Executive Agency

Road ULTRA-E

Long distance electrical vehicles (EV) have a driving distance of up to 500 km. This is a significant improvement in comparison to the previous EV generation that had to stop to recharge every 100-150 km. However, charging these new EV would take 1.5-2 hours on existing fast chargers. For this reason, the successful introduction of long distance EV depends on the availability of ultra-fast chargers that will reduce the charging time down to 20 minutes.

In this framework, the goal of the Action is twofold:

  • To deploy a pilot of 25 ultra-fast chargers (150-300 kW) on TEN-T Corridors connecting the Netherlands, Belgium, Germany and Austria, thus bringing direct benefits to EV drivers;
  • To use this pilot experience to promote the roll-out of ultra-fast charger stations in Europe. This will be done by analysing market and business models, evaluating the pilot experience and defining an EU roll-out plan. In this context the opportunity to use European Investment Bank innovative financial instruments will be studied.

The Action is therefore expected to contribute to the roll out of ultra-fast chargers in Europe and furthermore to promote the use of (long distance) EV in Europe.

Estimated cost of the action:

 

€13,085,300

Percentage of EU support: 50%

Maximum EU contribution: 

 

€6,542,650

 

Download the Info Sheet about this project:

/inea/en/file/fiche2015-eu-tm-0367-sfinal.pdf.pdf

 

Please note that the present document is for information purposes only. The content and conditions of the grant agreement always prevail over any different information which may be included in this document or elsewhere.

2015-EU-TM-0367-S

Click map to view enlarged version

Member States involved:

Austria, Belgium, Germany, The Netherlands

 

Implementation schedule:

Start date: March 2016

End date: December 2018

 

Project coordinator:

 Allego B.V.

 

Additional information:

 European Commission, DG MOVE

 Coordinator's report on the Corridor