Innovation and Networks Executive Agency

Road Fast-E (DE/BE)

2014-EU-TM-0196-S

While surrounding countries such as The Netherlands, Denmark, France, and Austria are developing electric vehicle (EV) markets, the markets in Germany and Belgium are lagging behind. This Action will conduct a study with integrated pilot, in view of future roll-out. It will deploy 241 multi-standard fast chargers in Germany and 37 in Belgium. This represents less than 3% of the estimated needed infrastructure by 2020, in Germany. The Action is located on several TEN-T corridors (North Sea-Mediterranean, Orient-East Med, Scandinavian-Mediterranean, Rhine-Alpine, North Sea-Baltic corridors, etc).

 

It is complemented by a twin application, FAST-E (CZ/SK) which will deploy 29 fast chargers locations in the Czech Republic and Slovakia, on corridors connecting to Germany. An innovative open source ICT-platform across the entire EV value chain will facilitate integrated end-to-end EV services, available to all market participants.

 

Estimated cost of the action:

 

€17,519,700
 

Percentage of EU support:

 

50%

Maximum EU contribution:

 

€8,759,850

 

Download the Info Sheet about this project:

/inea/en/file/fiche2014-eu-tm-0196-sfinal.pdf.pdf

 

Please note that the present document is for information purposes only. The content and conditions of the grant agreement always prevail over any different information which may be included in this document or elsewhere.

2014-EU-TM-0196-S

Click map to view enlarged version

Member States involved:

Belgium, Germany

 

Implementation schedule:

Start date: September 2014

End date: September 2017

 

Beneficiaries & implementing bodies:

 Allego Gmbh (coordinator)

 Allego BVBA

 DB Energie

 Renault SAS

 Nissan West Europe SAS

 Volkswagen AG

 hySOLUTIONS GmbH

 RWE Effizienz GmbH

 BMW

 envia Mitteldeutsche Energie AG

 

Additional information:

 European Commission, DG MOVE