Innovation and Networks Executive Agency

Lithuania Lithuania

Please note that the listing below is not exhaustive. More action information will be added as this website continues to be enhanced and updated.

Construction of the Gas Interconnection Poland-Lithuania (GIPL) including supporting infrastructure
Preparatory works for the Gas Interconnection Poland-Lithuania up to building permission(s) obtainment
Construction of the Klaipeda-Kursenai Gas Transmission Pipeline
The Feasibility Study and Cost-Benefit Analysis for the Enhancement of Latvia-Lithuania Interconnection
Study on Dynamic behavior of synchronously interconnected Baltic States and Continental European electricity network
Study of Isolated Operation of Baltic Power System
"Baltic Synchronisation Project – Phase 1"
Evaluation of technical condition of the infrastructure and penstock site for the Kruonis PSPP Expansion
Evaluation of Suitability of Different Technological Solutions and Socioeconomic Analysis
LitPol Link construction

Pages