Construction works for the PCI infrastructure cluster 8.3
Reinforcement of the national gas transmission systems in Poland and Denmark for the Baltic Pipe Project
Preparatory works for the Baltic Pipe Project up to obtainment of all necessary permission(s) in Poland and in Denmark
Feasibility Study regarding the PCI Poland - Denmark interconnection "Baltic Pipe" TRA-N-271
Feasibility Study regarding the interconnector between Kassoe (DK) and Audorf (DE)
Viking Link Unexploded Ordnance Risk Mitigation Stage 2
Viking Link Final Project Development
Viking Link Unexploded Ordnance Risk Mitigation Stage 1