8.3.1-0035-PLDK-W-M-18

INEA ceased operations on 31 March 2021. The European Climate, Infrastructure and Environment Executive Agency (CINEA) was established on 1 April 2021 to take over its legacy portfolio as well as additional EU funding programmes.
Construction works for the PCI infrastructure cluster 8.3
Programme: 
CEF Energy
Call year:
Location of the Action:
Implementation schedule: 
January 2019 to December 2022
Maximum EU contribution: 
€214,920,000
Total eligible costs: 
€716,400,000
Percentage of EU support: 
30%
Beneficiaries: 

Operator Gazociągów Przesyłowych GAZ-SYSTEM S.A. (Poland)
http://en.gaz-system.pl

Status:
Energy corridor:
Energy sector:
Project(s) of Common Interest:
Additional information: 

European Commission, DG ENER
http://ec.europa.eu/energy/en/topics/infrastructure

Agency for the Cooperation of Energy Regulators (ACER)
http://www.acer.europa.eu/

European Network of Transmission System Operators for Gas (ENTSOG)
http://www.entsog.eu/

Last modified: 
November 2021

8.3.1-0035-PLDK-W-M-18

The Action contributes to the implementation of the Projects of Common Interest (PCI) 8.3.1 Reinforcement of Nybro-Poland/Denmark Interconnection and PCI 8.3.2 Poland-Denmark interconnection (known as Baltic Pipe).

The objective of this Action is to carry out the construction works for the infrastructure elements of Baltic Pipe which are part of this Action, namely: a bi-directional offshore gas pipeline connecting PL and DK through the Baltic Sea (estimated length approx. 275 km), two onshore pipeline sections in PL connecting the offshore gas pipeline with the Polish national gas transmission system (total estimated length approx. 90 km), the receiving terminal, the onshore pipeline from Goleniów to Lwówek (estimated length approx. 192 km), as well as the expansion of the compressor stations located in Goleniów and in Odolanów.

The Action builds upon the results of the ongoing Actions 8.3-0025-PLDK-S-M-17 and 8.3.1-0009-PLDK-S-M-18 which relate to Front End Engineering Design (FEED) and permitting.

The completion of this Action will contribute to the implementation of the PCI cluster 8.3 (PCI 8.3.1 and 8.3.2) by taking crucial steps resulting in the construction and commissioning of the Baltic Pipe project.