enEnglish
CROS

12/11/2012 deliverables

In this form are included all the deliverables released the 12/10/2012 divided by WP:

WP2 Deliverables

D2.1

D2.2

D3.2

Other documentation

WP3 Deliverables (all the deliverable are available to the URL http://www.ecollect-x.eu/en/deliverables-of-essnet-project.aspx)

  • D3.0. Installation guide (includes source code)
  • D3.1. System architecture
  • D3.1.1 eCollect-x II - plan of development
  • D3.2. User documentation (temp in progress version)
  • D3.3. Presentation of results
  • D3.4. DDI and SDMX analysis

WP4 Deliverables

BNSI:

ISTAT

Web Site for upgraded versions of the Loader application

WP5 Deliverables: