Intelligent Energy Europe

Service tools

  • Current languageen

Navigation path

Sustainable Energy Infrastructure for Greenport Venlo (ENERGY4FLEXIBILITY)

Download PDFDownload PDF
The objective is to significantly increase the share of renewable/waste energy supplies as part of the District Heating and Cooling Networks in three areas on Greenpark Venlo in The Netherlands.The aim is to provide heat, cold and electricity on a sustainable manner for all buildings (existing and future) on the site, thereby closing the chain of energy demand. An important part of the proposed action is to replicate the projects on area level and to inspire other local authorities. Energy is very important both for the three municipalities and the province united in the public body DCGV and for the agricultural-industrial companies on Greenport Venlo (energy is a major part of their cost structures and sustainability is becoming more and more important for their businesses). Closing the chain of energy demand needs clustering of a wide variety of businesses. Developing such an area wide energy infrastructure based on renewables requires a long term focus and the opportunity of attracting long term finance. This is provided by the participation of the local and provincial public authorities. In the project technical engineering will be done and with suppliers of residual heat and biogas on the one side and contracts will be signed with clients on the other side. The investments are in generation and distribution of heat and cold. During the proposed action the investments will be prepared, leading to financial closing and signing of contracts.

Results

  • Contracts signed or call for tenders launched for Renewable energy supply technologies and district heating and cooling networks at Greenport velo;
  • Efficient communication and dissemination on other projects by means of the information centre and presentations to local authorities (provinces and municipalities) and consultants in the Netherlands and other EU-member states, informing them about the project;
  • Energy savings of 87,500 MWh/year : increase in RES-supply (163,837 MWh/year); CO2-reduction (150,802 tonnes/year); investment during the action (€54,634,857); significant increase in overall sustainability through the operationalization of the cradle-to-cradle philosophy.
Top

Lessons learned

  • For further details please refer to the project website.
Top

Partners and coordinator

List Map
CV WOM K4Netherlands
Liandon BVNetherlands
Ekwadraat BVNetherlands
Alliander NVNetherlands
Groene Energie Administratie BVNetherlands
ARCADIS NEDERLAND BVNetherlands
Top

Contact

CV WOM K4
Netherlands
Contact point: 
Name: 
René Postulart
Tel: 
+31 (0) 77 8503456

Budget

In brief

Duration:
01/04/2013 to 31/03/2016
Contract number: 
IEE/12/825

Related projects

More projects