Four waves of preparatory measures have been carried out between 1998
and 2001 through two different budget lines. This corresponds to 250
transnational projects.
2001 social exclusion
This document presents the objectives of the call and the results of the
selection process, including a short description of the 46 selected projects
(full translation will be soon available). All projects are supposed to
start before the end of 2001 for a maximum period of 18 months.
PDF :
-
2000 social exclusion in PDF format in
-
2000 civil dialogue in PDF format
in
-
1999 social exclusion in PDF format
in
-
1999 civil dialogue in PDF format
in
-
1998 available in PDF format in
-
-
-
-

