Descripción del proyecto

Design, Construction and Financing of the westward extension of Thessaloniki Metro, 4.4 km long, from new railway station to Evosmos and Kordelio with 4 new stations.

The proposed investment project involves the design, the construction and the financing of the west extension of Thessaloniki Metro, 4,4 km long, from new railway station to Evosmos and Kordelio with 4 new stations (Ampelokipoi, Menemeni, Evosmos, Kordelio). The Designs for the extension are in preliminary stage. Multiple scenarios are being examined including operation, maintenance and exploitation.

País, región

Grecia [Κεντρική Μακεδονία (Kentriki Makedonia)]

Fecha de comienzo

diciembre 2018

Coste estimado del proyecto

440 millones de euros

sector

Proyectos de movilidad urbana

Titularidad de los activos

Pública

Tipo de proyecto

Totalmente nuevo

Estado del proyecto

Estructuración

Tipo de ingresos

availability payments+State Financial Contribution

Justificación económica / modelo empresarial

Upon commissioning of the Extension, the Metro System will upgrade transport services in the densely populated Municipalities of the city of Thessaloniki contributing to the reduction in the daily number of circulating private vehicles by approximately 15,000, since it is anticipated that the subject extension will serve over 60,000 passengers on a daily basis.
More precisely, the investment project: advances the continuous integration of transport infrastructure and transport policy development, promotes European Infrastructure Standards, optimizes accessibility facilities, strengthens Interconnectivity and Regional Integration, addresses the functioning city including peri-urban zones, contributes at ensuring full cooperation on infrastructure interoperability, contributes catching up delayed reform, restructuring and modernization of the transport sector, making clear the interconnectivity with stations and airports of the TEN-T (last mile connections), should involve all relevant actors, notably Member State authorities, regional and local authorities, the industry and the business community.

Detalles de la financiación

Fuente de financiación: Asociación público-privada

The project cost breaks down: CW: €277,2m (60%), E/M systems: €114,4m (27%), Rolling stock: €48,4m (13%). The project duration is estimated at 5 years.
The proposed business model is that of a PPP. During the operational phase, the project revenues will come from ticket sales, advertising, parking fees from transfer stations, other commercial activities, as well as availability payments by the state.

El promotor ha recibido/solicitado apoyo financiero de la UE/el BEI en relación con este proyecto.

Obstáculos existentes o potenciales para la realización del proyecto / Riesgos potenciales

The pending introduction to the Greek Parliament of legislation regarding public works and permitting as well as of legislation that integrates 2014 EU Directives 23, 24 & 25, regarding public procurement contracts, will lead to the resolution of potential risks and / or bottlenecks relating to the process leading up to the contracting stage and to the monitoring of the project for the whole period of construction and operation.