Navigation path

Additional tools

Transport infrastructures - TEN-T

Priority Projects

Based on the proposals from the Member States, there have been identified 30 Priority Projects which are included in the guidelines for the development of the TEN-T as projects of European interest.

The Priority Projects were chosen both according to their European added-value and their contribution to the sustainable development of transport.  Their completion - planned for 2020 - will improve the economic efficiency of the European transport system and provide direct benefits for European citizens.

Of these 30 key projects, 18 are railway projects, 3 are mixed rail-road projects, 2 are inland waterway transport projects and one refers to Motorways of the Sea. This choice reflects a high priority to more environmentally friendly transport modes, contributing to the fight against climate change.

There has been a firm commitment on behalf of the Member States and the European Union to deliver these key Priority Projects and they have been at the centre of the European Union's efforts - both financially and in terms of coordination. In July 2005 the European Commission has in particular designated a group of nine eminent European Coordinators to evaluate the progress of certain TEN-T Priority Projects, to make recommendations for the effective implementation of these projects and to play a major role in advancing the works.

The 30 Priority Projects are:

PP1 Railway axis Berlin-Verona/Milano-Bologna-Napoli-Messina-Palermo

PP2 High-speed railway axis Paris-Bruxelles/Brussel-Köln-Amsterdam-London: PBKAL

PP3 High-speed railway axis of southwest Europe

PP4 High-speed railway axis east

PP5 Betuwe line: COMPLETED 2007

PP6 Railway axis Lyon-Trieste-Divaca/Koper-Divaca-Ljubljana-Budapest-Ukrainian border

PP7 Motorway axis Igoumenitsa/Patra-Athina-Sofia-Budapest

PP8 Multimodal axis Portugal/Spain-rest of Europe

PP9 Railway axis Cork–Dublin–Belfast–Stranraer: COMPLETED 2001

PP10 Malpensa airport: COMPLETED 2001

PP11 Øresund bridge: COMPLETED 2000

PP12 Nordic Triangle railway/road axis

PP13 Road axis United Kingdom/Ireland/Benelux

PP14 West coast main line: COMPLETED 2009

PP15 Galileo

PP16 Freight railway axis Sines/Algeciras-Madrid-Paris

PP17 Railway axis Paris-Strasbourg-Stuttgart-Wien-Bratislava

PP18 Waterway axis Rhine/Meuse-Main-Danube

PP19 High-speed rail interoperability in the Iberian Peninsula

PP20 Railway axis Fehmarn belt

PP21 Motorways of the Sea

PP22 Railway axis Athina–Sofia–Budapest–Wien–Praha–Nürnberg/Dresden

PP23 Railway axis Gdansk-Warszawa-Brno/Bratislava-Wien

PP24 Railway axis Lyon/Genova-Basel-Duisburg-Rotterdam/Antwerpen

PP25 Motorway axis Gdansk-Brno/Bratislava-Vienna

PP26 Railway/road axis Ireland/United Kingdom/continental Europe

PP27 "Rail Baltica" axis: Warszawa-Kaunas-Riga-Tallinn-Helsinki

PP28 "Eurocaprail" on the Brussels-Luxembourg-Strasbourg railway axis

PP29 Railway axis of the Ionian/Adriatic intermodal corridor

PP30 Inland Waterway Seine-Scheldt

Related documents

Progress Report

Progress Report - November 2012 pdf - 7 MB [7 MB]

Progress Report - June 2010 - Implementation of the TEN-T Priority Projects pdf - 8 MB [8 MB]

Position Paper

Position paper of the European Transport Coordinators on the Future of TEN-T policy [06/10/2009] pdf - 136 KB [136 KB] Deutsch (de) français (fr)

Mr. Karel VAN MIERT, Mr. Etienne DAVIGNON, Mr.Carlo SECCHI, Mr. Laurens Jan BRINKHORST, Mr. Péter BALÀZS, Ms. Karla PEIJS, Mr. Luìs VALENTE de OLIVEIRA, Mr. Pavel TELIÄŒKA, Mr. Karel VINCK

Priority Projects 2010 - A Detailed Analysis

Priority Projects 2010 - A Detailed Analysis Report pdf - 14 MB [14 MB]

Map of the 30 PPs

Priority Projects Map - May 2010