The North European FAB submitted their consultation material to the European Commission on 4 January 2012.
Interested parties, Member States and EASA, are invited to provide observations to the European Commission by 12 March 2012, by using the Common Response Document
[182 KB] (CRD). When completed, the CRD shall be sent by e-mail to the European Commission (patrick.bernard@ec.europa.eu).
All NEFAB's consultation matérial can be found hereunder. Note that material of other FABs will be made available in due course of time after their submission.
1. Cover papers
-
Cover letter
[271 KB]
-
Signature by the Member States of NEFAB
[22 KB]
-
Information to the EC, the EASA, other Member States and interested parties on the establishment of NEFAB
[546 KB]
2. Institutional
-
NEFAB political declaration
[743 KB]
-
State level agreement, initialled
[7 MB]
-
NSA agreement, initialled 22/12/2011
[176 KB]
-
NEFAB ANSP agreement, draft
[405 KB]
-
Cooperation agreement between Avinor, Finavia, Isavia, LGS, EANS, LFV and Naviair
[201 KB]
3. Safety
-
NEFAB Safety Plan
[530 KB]
-
NEFAB Safety Case report
[2 MB]
-
Change Management manual
[459 KB]
-
Initiative 13, Safety Management Systems
[133 KB]
4. Operational
-
Operational Concept
[90 KB]
-
Initiative 1, ATS routes and sectorisation
[2 MB]
-
ATS routes and sectorisation, Appendix 1, RNDSG-RDGE route catalogue
[759 KB]
-
ATS routes and sectorisation, Appendix 2, NEFAB route proposals
[84 KB]
-
ATS routes and sectorisation, Appendix 3, NEFAB sector loads
[760 KB]
-
ATS routes and sectorisation, Appendix 4, improvement areas
[4 MB]
-
Initiative 3, Optimisation of ATS
[291 KB]
-
Initiative 4, Optimisation of ASM and ATFCM
[296 KB]
-
Initiative 6, Harmonisation of operational rules and procedures
[110 KB]
-
NEFAB Military requirements
[29 KB]
5. Technical
-
Initiative 5, Optimisation of anciallary services
[117 KB]
-
Initiative 8, Supervision and monitoring of CNS infrastructure
[88 KB]
-
Initiative 9, Commonality of CNS and ATM systems
[136 KB]
-
Avinor, NAV, Status and the road ahead
[293 KB]
-
Avinor, SUR, Status and the road ahead
[102 KB]
-
Avinor, COM, Status and the road ahead
[75 KB]
-
EANS CNS, Overview and roadmap
[772 KB]
-
Finavia, NAV, Status and the road ahead
[156 KB]
-
Latvia, Communication equipment
[15 KB]
-
Avinor, NAV, Status and the road ahead
-
Initiative 10, Joint evaluation of technology within CNC and ATM
[87 KB]
-
Initiative 11, Common system maintenance
[76 KB]
-
Initiative 12, Joint procurement
[98 KB]
6. Economic
-
NEFAB socio-economic study, Volume 1
[2 MB]
-
NEFAB CBA report
[2 MB]
7. Human/social
8. Additional
-
NEFAB FSR main
[460 KB]
Next steps in the FAB consultation and implementation process include :
- collection of observations,
- consolidation of received observations,
- responses by FAB,
- FAB establishment and notification of the FAB agreements, and
- assessment of formal requirements.
Results of the consultation (update of 16 March 2012)
All observations received by the European Commission have been assembled in the Common Response Document
[2 MB] .
A summary
[2 MB] of the comments by the European Commission, EASA, the Network Manager, and the Performance Review Body is also available.




