Navigation path

Additional tools

Air

NEFAB consultation process

The North European FAB submitted their consultation material to the European Commission on 4 January 2012.

Interested parties, Member States and EASA, are invited to provide observations to the European Commission by 12 March 2012, by using the Common Response Document msw8 - 182 KB [182 KB] (CRD). When completed, the CRD shall be sent by e-mail to the European Commission (patrick.bernard@ec.europa.eu).

All NEFAB's consultation matérial can be found hereunder. Note that material of other FABs will be made available in due course of time after their submission.

1. Cover papers

  1. Cover letter pdf - 271 KB [271 KB]
  2. Signature by the Member States of NEFAB pdf - 22 KB [22 KB]
  3. Information to the EC, the EASA, other Member States and interested parties on the establishment of NEFAB pdf - 546 KB [546 KB]

2. Institutional

  1. NEFAB political declaration pdf - 743 KB [743 KB]
  2. State level agreement, initialled pdf - 7 MB [7 MB]
  3. NSA agreement, initialled 22/12/2011 pdf - 176 KB [176 KB]
  4. NEFAB ANSP agreement, draft pdf - 405 KB [405 KB]
  5. Cooperation agreement between Avinor, Finavia, Isavia, LGS, EANS, LFV and Naviair pdf - 201 KB [201 KB]

3. Safety

  1. NEFAB Safety Plan pdf - 530 KB [530 KB]
  2. NEFAB Safety Case report pdf - 2 MB [2 MB]
  3. Change Management manual pdf - 459 KB [459 KB]
  4. Initiative 13, Safety Management Systems pdf - 133 KB [133 KB]

4. Operational

  1. Operational Concept pdf - 90 KB [90 KB]
  2. Initiative 1, ATS routes and sectorisation pdf - 2 MB [2 MB]
  3. ATS routes and sectorisation, Appendix 1, RNDSG-RDGE route catalogue pdf - 759 KB [759 KB]
  4. ATS routes and sectorisation, Appendix 2, NEFAB route proposals pdf - 84 KB [84 KB]
  5. ATS routes and sectorisation, Appendix 3, NEFAB sector loads pdf - 760 KB [760 KB]
  6. ATS routes and sectorisation, Appendix 4, improvement areas pdf - 4 MB [4 MB]
  7. Initiative 3, Optimisation of ATS pdf - 291 KB [291 KB]
  8. Initiative 4, Optimisation of ASM and ATFCM pdf - 296 KB [296 KB]
  9. Initiative 6, Harmonisation of operational rules and procedures pdf - 110 KB [110 KB]
  10. NEFAB Military requirements pdf - 29 KB [29 KB]

5. Technical

  1. Initiative 5, Optimisation of anciallary services pdf - 117 KB [117 KB]
  2. Initiative 8, Supervision and monitoring of CNS infrastructure pdf - 88 KB [88 KB]
  3. Initiative 9, Commonality of CNS and ATM systems pdf - 136 KB [136 KB]
    1. Avinor, NAV, Status and the road ahead pdf - 293 KB [293 KB]
    2. Avinor, SUR, Status and the road ahead pdf - 102 KB [102 KB]
    3. Avinor, COM, Status and the road ahead pdf - 75 KB [75 KB]
    4. EANS CNS, Overview and roadmap pdf - 772 KB [772 KB]
    5. Finavia, NAV, Status and the road ahead pdf - 156 KB [156 KB]
    6. Latvia, Communication equipment pdf - 15 KB [15 KB]
  4. Initiative 10, Joint evaluation of technology within CNC and ATM pdf - 87 KB [87 KB]
  5. Initiative 11, Common system maintenance pdf - 76 KB [76 KB]
  6. Initiative 12, Joint procurement pdf - 98 KB [98 KB]

6. Economic

  1. NEFAB socio-economic study, Volume 1 pdf - 2 MB [2 MB]
  2. NEFAB CBA report pdf - 2 MB [2 MB]

7. Human/social

  1. Initiative 7, Optimisation of training pdf - 130 KB [130 KB]

8. Additional

  1. NEFAB FSR main pdf - 460 KB [460 KB]

Next steps in the FAB consultation and implementation process include :

  • collection of observations,
  • consolidation of received observations,
  • responses by FAB,
  • FAB establishment and notification of the FAB agreements, and
  • assessment of formal requirements.

Results of the consultation (update of 16 March 2012)

All observations received by the European Commission have been assembled in the Common Response Document pdf - 2 MB [2 MB] .

A summary pdf - 2 MB [2 MB] of the comments by the European Commission, EASA, the Network Manager, and the Performance Review Body is also available.