MOBILITY AND TRANSPORT
TENtec Interactive Map Viewer

Menu

Background Map

Change background to GISCO Open Street map?

Exporting map works only with GISCO Open Street map or TEN-T official background

Cancel OK

Preview of exported map

If you wish to copy the image, please click on the right mouse button and select copy

Save
Close

Disclaimer

The designations employed and the presentation of material on the map do not imply the expression of any opinion whatsoever on the part of the European Union concerning the legal status of any country, territory or area or of its authorities, or concerning the delimitation of its frontiers or boundaries.
The corridor alignment is based on the Regulation (EU) 2021/1153 of the European Parliament and of the Council of 7 July 2021.

Close

share your map

Close

Tools

Close

Layer Information

Close

Layer Information

MOBILITY AND TRANSPORT
TENtec Interactive Map Viewer

Export Map

Format:

Select Extent Export

MOBILITY AND TRANSPORT
TENtec Interactive Map Viewer

Filter data

Geographical coverage:
                          
Buffer zones around TEN-T roads:

Reset Apply

MOBILITY AND TRANSPORT
TENtec Interactive Map Viewer

TENtec Geographic Information System

About:
The displayed TEN-T trajectories and TEN-T nodes are based on the commission adopted comprehensive and core network (COMMISSION DELEGATED REGULATIONS (EU) 2019/254 OF 9 NOVEMBER 2018 & (EU) 2017/849 OF 7 DECEMBER 2016 AMENDING REGULATION (EU) No 1315/2013 OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL of 11 December 2013 on Union guidelines for the development of the trans-European transport network and repealing Decision No 661/2010/EU).
The comprehensive network constitutes the basic layer of the TEN-T. It consists of all existing and planned infrastructure meeting the requirements of the Guidelines. The comprehensive network is to be in place by 31 December 2050 at the latest.
The core network overlays the comprehensive network and consists of its strategically most important parts. It constitutes the backbone of the multi-modal mobility network. It concentrates on those components of TEN-T with the highest European added value: cross border missing links, key bottlenecks and multi-modal nodes.
The core network is to be in place by 31 December 2030 at the latest. The core network corridors (According to chapter IV of TEN-T Regulation (EU) No 1315/2013 and as listed in Part I of Annex I of CEF Regulation (EU) No 1316/2013.) are composed of 9 corridors crossing Europe. Covering at least three modes, these Corridors, based upon the Core Network, are set up starting from important entry points into the network, integrating the main cross-border sections and physical bottlenecks still to be realised, corresponding to the main trans-national traffic flows with a genuine European dimension, from the Union’s borders in the east to the ports in the west, from the North and Baltic Seas to the Mediterranean, from the Atlantic Ocean to central Europe.

Contact:
This site is maintained by DG Mobility and Transport of the European Commission.
If you have further questions or comments relating to the TENtec Geographic Information System, please send them by e-mail at: MOVE-ENER-GIS@ec.europa.eu
If you have a general question regarding the European Union, you might use the EUROPE DIRECT Freephone Number 00 800 6 7 8 9 10 11 from anywhere in the 28 Member States and reach an operator who speaks your language, or submit in your language your question to the EUROPE DIRECT mailbox.

Legal notice

Infrastructure - TEN-T - Connecting Europe

TENtec Information System

Version:
Current version : 4.8.0
Date: 06.03.2024
Release Notes

Supported internet navigators:
Internet explorer 9 or above
FireFox 6 or above
Chrome 14 or above
Opera 15 or above
Safari 6 or above
Webkit , Chrome and Opera mini on Android 4.0.0 or above
Safari on IOS 6.0 or above

Copyright:
© European Union, 2024