Research & Innovation - Participant Portal

TOPIC : Network Collaborative Management

Topic identifier: SESAR.IR-VLD.Wave1-23-2015
Publication date: 22 October 2015

Types of action: SESAR-IA Innovation action
DeadlineModel:
Opening date:
single-stage
29 October 2015
Deadline: 20 April 2016 17:00:00

Time Zone : (Brussels time)
  Horizon 2020
Topic Updates
  • 06 April 2016 18:17

    When reference is made to “candidate members” in this call, this shall be understood as meaning “Members”.

  • 17 March 2016 12:20

    Please note that as a result of the accession of new members to the SESAR Joint undertaking, the list of eligible entities that can submit a proposal in response to the present call, restricted to the SJU Members, has been amended. Therefore the “Excel file (and its Guidance) of Technical Proposal Template for VLDs” is not valid any longer and have been removed.

  • 16 March 2016 16:25

    Please note that the call deadline has been extended to 20/04/2016.

Topic Description
Specific Challenge:

Network Collaborative Management improves the European ATM network performance, notably capacity and flight efficiency through exchange, modification and management of trajectory information. Flow Management shall move to a Cooperative Traffic Management environment, optimising the delivery of traffic into sectors and airports and the need for Air Traffic Flow and Capacity Management (ATFCM) measures.

This project is an integral part of the SESAR Solutions delivery approach towards the SESAR deployment phase. The objective of this VLD is to bridge “industrial research” and “deployment” related to the PCP ATM Functionality 4 (as defined in Commission Implementing Regulation EU No 716/2014), and not to replace either type of activity.

Scope:

This VLD shall address measures coordinated in the pre-departure phase of flight(s), as well as measures coordinated in the execution phase of flight(s). The coordination process is seen as continuous function that may deal with various phases of flights simultaneously. Measures and coordination processes may be depending on the specific phase of the flight(s).

The demonstration exercises that are part of this VLD should:

  • establish a limited set of connected SESAR high-technology demonstration platforms in relation to the “Optimised ATM Network Management” key feature of the SESAR 2020 programme. This VLD shall aim at a minimum at a demonstration in a close-to-operational environment including the preparation and platform availability to support demonstrations in targeted operational environments involving end-users. The involvement of additional end-users to perform the related operational demonstration will be contracted through open calls that will be awarded in a second step and will run in parallel.

  • establish a limited set of connected SESAR high-technology demonstration platforms in relation to the “Optimised ATM Network Management” key feature of the SESAR 2020 programme.

This VLD shall aim at a minimum at a demonstration in a close-to-operational environment including the preparation and platform availability to support demonstrations in targeted operational environments involving end-users. The involvement of additional end-users to perform the related operational demonstration will be contracted through open calls that will be awarded in a second step and will run in parallel.

The demonstration platform(s) to be established shall rely on the following elements:

  • Enhanced DCB procedures between all actors involved in Network Operations (ANSPs, Airports, Airspace Users, Network Manager) supported by automated tools for Advanced ATFCM measures (local hotspot detections assessed in the network view, elaboration and promulgation of STAM measures including CDM, implementation and monitoring of these measures).

  • Complexity and Capacity solutions supported by local DCB tools using SWIM Services to interconnect these tools and NM system, allowing local actors (including the link to airport planning processes) to identify and manage hotspots.

Expected Impact:

This VLD will assess the benefit of Collaborative Network Management to improve ATM Network performance; it will serve as Proof of Concept for AF#4 as defined in the PCP.

The Proof of Concept to be conducted under this VLD is a confidence building exercise that comes in addition to the traditional validation required prior to certification and implementation of new concepts or new technologies. This has to be distinguished from operational live trials since it brings a new dimension of the validation: early operations with a significant scale environment.

The Proof of Concept consists in an early operation of the SESAR Solutions making use of pre-operational or operational products (airborne and ground) in a real operational environment.

Topic conditions and documents

The SJU is launching a Call for Proposals under H2020 restricted to its candidate members (c.f.: eligibility conditions below) with a view to implement “SESAR 2020 Transversal Activities”, “Industrial Research& Validation Activities” and “Very Large Scale Demonstration Activities”

Please read carefully all provisions below before the preparation of your application. The key reference documents for this Call for Proposal are the amended SJU Work Programme 2015 and SESAR 2020 Multi-Annual Work Programme. They set out the purpose and scope of the IR/VLD Call for Proposals and describe the activities that will be implemented via the resulting Grant Agreements as well as the conditions for participation and award.

The purpose of this procedure is to award a maximum of 28 (twenty eight) Grant Agreements (GAs), one per “Topic”. This is the relevant model agreement: SJU Model Grant Agreement (MGA). General guidance can be found in the Annotated Model Grant Agreement (AMGA).  Please refer also to the SJU MGA Budget Amendment Process.

  1. List of countries and applicable rules for funding: Described in the amended SJU Work Programme 2015.
     
  2. Eligibility and admissibility conditions: This Call for Proposals is restricted to the Eligible Entities as identified in the amended SJU Work Programme 2015, subject to their selection as SJU Members as a result of the ad-hoc Call for final SJU Membership Applications.The admissibility conditions are described in the amended SJU Work Programme 2015.
     
  3. Proposal page limits and layout: Please refer to Part B of the SJU proposal templates for the VLD projects, which can be downloaded after entering the submission tool below.
     
  4. Evaluation

    4.1  Evaluation criteria and procedure, scoring and threshold: Described in the amended SJU Work Programme 2015.

    4.2 Submission and evaluation process: Described in the Guide to the submission and evaluation process
          
  5. Indicative timetable for evaluation and grant agreement:

    Information on the outcome of single-stage evaluation is provided maximum 5 months from the deadline for submission.
    Signature of grant agreements: maximum 8 months from the deadline for submission, and maximum 3 months from the date of informing successful applicants.
     
  6. Provisions, proposal templates and evaluation forms for the type(s) of action(s) under this topic:

    The provisions, templates and evaluation forms for the Very Large Scale Demonstration projects (Innovation Actions) are provided below:
    - Specific provisions and funding rates are described in the amended SJU Work Programme 2015
    - SJU proposal templates (Administrative forms and Technical annex) are available after entering the "start submission" button and then after entering the "Download Part B Templates" button
    - SJU Self-Evaluation Form for VLD Projects
                                                                                                                                                                                                                                                                                                       
  7. Technical documentation

        - The SJU Work Programme is defined in the SESAR 2020 Multi-Annual Work Programme document.
        - For the VLD projects, the Technical Specifications for each Topic can be found in Appendix D of the SESAR 2020 Multiannual Work Programme
        - The Extended Release Strategy indicating the prioritized SESAR Solutions and the major Programme milestones for Wave 1 and Wave 2. 
        - An overview of the applicable Programme Management processes is provided in the Introduction to SESAR 2020 Programme Execution document
        - Proposed European ATM Master Plan edition 2015
 

Additional documents

Download all documents
(EN only, incl. the additional docs.)

Submission Service

No submission system is open for this topic.

Get support

H2020 Online Manual your online guide on the procedures from proposal submission to managing your grant.

Participant Portal FAQ Submission of proposals.

National Contact Points (NCP) - contact your NCP for further assistance.

Research Enquiry Service – ask questions about any aspect of European research in general and the EU Research Framework Programmes in particular.

IT Helpdesk- contact the Participant Portal IT helpdesk for questions such as forgotten passwords, access rights and roles, technical aspects of submission of proposals, etc.

Ethics – for compliance with ethical issues, see the Participant Portal and Science and Society Portal

European IPR Helpdesk assists you on intellectual property issues