Navigation path

Countries
Countries
  Argentina
  Australia
  Austria
  Belarus
  Belgium
  Benin
  Brazil
  Bulgaria
  Cameroon
  Canada
  Chile
  China
  Colombia
  Croatia
  Cyprus
  Czech Republic
  Denmark
  Egypt
  Estonia
  Finland
  France
  Georgia
  Germany
  Ghana
  Greece
  Hungary
  Iceland
  India
  Ireland
  Israel
  Italy
  Japan
  Kazakhstan
  Kenya
  Korea
  Latvia
  Lithuania
  Luxembourg
  Malta
  Mexico
  Montenegro
  Morocco
  Namibia
  Netherlands
  Nigeria
  Norway
  Peru
  Poland
  Portugal
  Romania
  Russia
  Senegal
  Serbia
  Slovakia
  Slovenia
  South Africa
  Spain
  Swaziland
  Sweden
  Switzerland
  Taiwan
  Tunisia
  Turkey
  Ukraine
  United Kingdom
  United States

Themes
Agriculture & food
Energy
Environment
ERA-NET
Health & life sciences
Human resources & mobility
Industrial research
Information society
Innovation
International cooperation
Nanotechnology
Pure sciences
Research infrastructures
Research policy
Science & business
Science in society
Security
SMEs
Social sciences and humanities
Space
Special Collections
Transport


   Countries

Last Update: 23-05-2013  
Related category(ies):
Success stories  |  Transport  |  SMEs

 

Countries involved in the project described in the article:
France  |  Greece  |  Lithuania  |  Poland  |  United Kingdom
Add to PDF "basket"

New weld inspection system to boost rail safety

Europe's railway networks have dedicated teams devoted to checking track safety, inspecting the metal for any cracks or defects that could cause problems. If a track needs fixing, it is often welded on-site. But for all their expertise, the track inspectors have few tools to check whether the resulting welds are strong enough. Now, however, researchers have built a new tool to provide an easy yet reliable ultrasonic test of track welds, adding a much-needed layer of safety to the rail network.


© silverrobert - Fotolia

The project, named Railect, has built a testing device that clamps on to the rail. Ultrasonic transducers then effectively inspect the weld, while the defect detection software crunches the data to seek deep, internal volumetric defects that cannot be seen with the naked eye.

“The system does a full volumetric inspection of the rail weld in less than 15 minutes and is very easy to operate because most of the operations are automated,” says Railect’s project coordinator Tamara Colombier, from TWI, a Cambridge-based research organisation. “Because it gives an accurate position of the size and location of any weld defects, it could also reduce the very high rejection rate given by the visual inspection.”

Although they fix flaws on the rails, the welds themselves can suffer shrinkage, hot tears, slag inclusions, failure to fuse, and porosity. Weld joint failures account for 20% of all rail failures, but because of the welds’ complex structure, geometry and thickness, it is difficult to check their strength and integrity of the volume beneath the surface. Indeed, because most checks are made with the human eye, a large number of welds with surface cracks are rejected even though they might be deeper inside.

There are an estimated 11 million welds on the European rail network, with around a thousand new ones added daily. But unless new tools become available, the rise in rail speeds, denser rail traffic, and heavier freight train weights are all likely to create more rail breaks across the European network. “Now that the high speed network is expanding within Europe, the frequency of the inspection and maintenance has to be increased,” says Colombier. “Having a reliable, advanced and innovative system of inspection such as the Railect system will contribute to the establishment of a safer European railway network.”

Backed by a €1.1 million grant from the European Commission, Railect’s partners – five from Britain, plus one each from Poland, France and Lithuania – have patented the technologies, and are working to bring it to market. Network Rail, the authority responsible for the United Kingdom's railway network, has already indicated it will buy 40 Railect units.

Colombier says that beyond the obvious benefits for safety, the technology will also reduce maintenance costs on Europe's rail network, costs associated with the high rejection rates. And by boosting the overall weld quality, it will ensure a smoother ride on passenger trains. “Railect could radically improve safety standards all over Europe,” Colombier says. “And that can only be good for Europe’s railways.”

Project details

  • Project acronym: RAILECT
  • FP7 Project N° 222425
  • Participants: United Kingdom (Coordinator), Greece, France, Lithuania, Poland
  • Total costs: €1 486 487
  • EU contribution: €1 120 350

Convert article(s) to PDF

No article selected


loading


Search articles

Notes:
To restrict search results to articles in the Information Centre, i.e. this site, use this search box rather than the one at the top of the page.

After searching, you can expand the results to include the whole Research and Innovation web site, or another section of it, or all Europa, afterwards without searching again.

Please note that new content may take a few days to be indexed by the search engine and therefore to appear in the results.

Print Version
Share this article
See also

Project web site

Project information on CORDIS

Contacts
Unit A1 - External & internal communication,
Directorate-General for Research & Innovation,
European Commission
Tel : +32 2 298 45 40
  Top   Research Information Center