European Commission - Growth

For a better experience, please enable Javascript!


Notification

Found : 10
 
  Body :

Lloyd's Register Verification Limited
71 Fenchurch Street
London EC3M 4BS
Country : United Kingdom

Phone : +44 330 414 1337
Fax : -

Email : ecdirectives@lr.org
Website : www.lr.org

Notified Body number : 0038

Version(s): 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32

Last update : 26/05/2017
 

Return to legislation list

Some information about the accreditation details are available in the PDF
Legislation
2008/57/EC Interoperability of the rail system within the Community (Recast)    
Last update : 20/04/2017                 Version(s): 1 2 3 4

Products Procedures Articles/Annexes Technical Specifications for Interoperability
1. Interoperability of the trans-European high-speed rail system
   - 1.1 Infrastructure
EC declaration of conformity and suitability for use of interoperability constituents
EC verification procedure for subsystems
Annex IV
Annex VI
INF HS Dec 2002/732
INF HS Dec 2008/217
OMNI Dec 2012/464
PRM Dec 2008/164
SRT Dec 2008/163
 
1. Interoperability of the trans-European high-speed rail system
   - 1.2 Energy
EC declaration of conformity and suitability for use of interoperability constituents
EC verification procedure for subsystems
Annex IV
Annex VI
ENE HS Dec 2002/733
ENE HS Dec 2008/284
OMNI Dec 2012/464
SRT Dec 2008/163
 
1. Interoperability of the trans-European high-speed rail system
   - 1.3 Control-command and signalling
EC declaration of conformity and suitability for use of interoperability constituents
EC verification procedure for subsystems
Annex IV
Annex VI
CCS Dec 2007/153
CCS Dec 2008/386
CCS Dec 2010/79
CCS Dec 2012/463
CCS HS Dec 2002/731
CCS HS Dec 2004/447
CCS HS Dec 2006/860
OMNI Dec 2012/464
SRT Dec 2008/163
 
1. Interoperability of the trans-European high-speed rail system
   - 1.4 Rolling stock
EC declaration of conformity and suitability for use of interoperability constituents
EC verification procedure for subsystems
Annex IV
Annex VI
LOC&PAS HS Dec 2002/735
LOC&PAS HS Dec 2008/232
OMNI Dec 2012/464
PRM Dec 2008/164
SRT Dec 2008/163
 
2. Interoperability of the trans-European conventional rail system
   - 2.1 Infrastructure
EC declaration of conformity and suitability for use of interoperability constituents
EC verification procedure for subsystems
Annex IV
Annex VI
INF CR Dec 2011/275
OMNI Dec 2012/464
PRM Dec 2008/164
SRT Dec 2008/163
 
2. Interoperability of the trans-European conventional rail system
   - 2.2 Energy
EC declaration of conformity and suitability for use of interoperability constituents
EC verification procedure for subsystems
Annex IV
Annex VI
ENE CR Dec 2011/274
OMNI Dec 2012/464
SRT Dec 2008/163
 
2. Interoperability of the trans-European conventional rail system
   - 2.3 Control-command and signalling
EC declaration of conformity and suitability for use of interoperability constituents
EC verification procedure for subsystems
Annex IV
Annex VI
CCS CR Dec 2006/679
CCS CR Dec 2009/561
CCS Dec 2007/153
CCS Dec 2008/386
CCS Dec 2010/79
CCS Dec 2012/463
CCS Dec 2012/696
CCS Dec 2012/88
CCS Dec 2015/14
CCS HS Dec 2006/860
CCS Reg 2016/919
OMNI Dec 2012/464
SRT Dec 2008/163
 
2. Interoperability of the trans-European conventional rail system
   - 2.4 Rolling stock
EC declaration of conformity and suitability for use of interoperability constituents
EC verification procedure for subsystems
Annex IV
Annex VI
LOC&PAS CR Dec 2011/291
NOI CR Dec 2006/66
NOI CR Dec 2011/229
NOI Reg 1304/2014
OMNI Dec 2012/464
PRM Dec 2008/164
SRT Dec 2008/163
WAG CR Dec 2006/861
WAG CR Dec 2009/107