6.3.11. Other essential points

See point 2.3.6.

Contingency reserve:

A reserve for contingencies and/or possible fluctuations in exchange rates not exceeding 5 % of the direct eligible costs may be included in the budget for external actions given the specificity and the higher level of unpredictability of external actions.