LiRiLi - Living River Liesing - Demonstrative Ecological Reconstruction of a Heavily Modified Waterbody in an Urban Environment

LIFE02 ENV/A/000282


Project description   Environmental issues   Beneficiaries   Administrative data   Read more   Print   PDF version  
 

Contact details:

Project Manager: Wilfried FELLINGER
Tel: +43-1-4000 9 6571
Fax: +43-1-4000 999 6571
Email: wilfried.fellinger@wien.gv.at



Project description:

Background

The river Liesing in Vienna has been heavily modified as a result of flood protection measures, its use as a watercourse for a water treatment plant and by an increased riverside population. The “LiRiLi” project covering 5.5 km of the river will be part of a large–scale restoration project for the entire river Liesing. It will be the first river of this size to be restored in an urban area. The River Engineering department is experienced in this field as a similar project was implemented on the River Wien.


Objectives

The objective of the pilot project is to maximise the “ecological potential” of the River Liesing, in conformity with the Water Framework Directive and specifically with regard to “heavily modified water bodies”. A canal-like concrete channel over 5.5km in length and located in an urban area will be re-designed into a semi-natural river meeting the relevant flood protection requirements. The “LiRiLi” project also aims at an improvement of the water quality (from quality class IV to quality classII of the saprobic system) by restoring the river continuity and different flow conditions. The flora and fauna will be improved and high quality public recreational areas will be established. Finally, information on the project will be disseminated on a large scale.


Results

The revitalisation activities included construction measures to restore the river continuity, the restoration of semi-natural morphological conditions and former meanders, the construction of a semi-natural river bed with a gravel substrate, and the restoration of the river’s natural transport capacity. The steep banks were flattened and partly enlarged and are now protected by bioengineering measures (willow fascines, wattle fence). Existing mesoxerophytic grassland has been preserved by storing it during the construction work and replanting it afterwards. For landscape design only indigenous trees and bushes were used. A pathway and a riverside child's playground were also constructed. The project was accompanied by intensive PR activities. The project has resulted in the creation of aquatic ecological corridor through the urban area with new habitats for priority species and recreation facilities. A new sewer system was also created and a local treatment plant and morphological parameter that discharge the water to the river Liesing were closed. As a result, within a year the water quality improved from quality class IV to quality class II to III of the saprobic system.


Top


Environmental issues addressed:

Themes

Biodiversity issues - Urban biodiversity
Water - River basin management


Keywords

restoration measure‚  recreational area‚  river management‚  water quality improvement‚  urban area


Target EU Legislation

  • Water
  • Directive 2000/60 - Framework for Community action in the field of water policy (23.10.2000)
  • Nature protection and Biodiversity
  • COM(2001)162 -"Biodiversity Action Plan for the conservation of natural resources (vol. I & II)" ...

Natura 2000 sites

Not applicable


Top


Beneficiaries:

Coordinator STADT WIEN, Magistratsabteilung 45 - Wasserbau
Type of organisation Local authority
Description The River Engineering Department of the City of Vienna is responsible for water-management planning, hydrology, river monitoring, flood protection and river restoration for the preservation and improvement of the ecological status of rivers within the border of the city of Vienna.

Top




Project reference LIFE02 ENV/A/000282
Duration 01-OCT-2002 to 31-JAN -2006
Total budget 2,005,350.00 €
EU contribution 770,500.00 €
Project location Wien(Österreich)

Top


Read more:

Publication: Case study "Fertigstellungsbericht Bauabschnitt 3(inklusive Ü ...
Publication: Layman report Layman report
Publication: Technical report "Revitalisierung des Liesingbaches : Rückbau des A ...
Slides Presentation "Umsetzung eines flussbauprojektes im städtischen ...
Slides Presentation "Revitalisierung Liesingbach : Gewässerökologische ...
Slides Presentation "Is "Living River Liesing" state of the art for ri ...
Video link A role model for renaturation of a "Heavily modified water body" in an urban environment (40')