Navigation path

 
Logo LIFE

Kranepoel - Preservation, Protection and Restoration of the Kranepoel and Surroundings (Aalter)

LIFE98 NAT/B/005172


Project description   Environmental issues   Beneficiaries   Administrative data   Read more   Print   PDF version  
 

Contact details:

Project Manager: A. DE MEYER
Tel: 32/9.325.22.00
Fax: 32/9.325.22.40



Project description:

Background

The Kraenepoel near Aalter is one of the remnants of the once desolate lands of the Bulskampveld, dominated by heathlands, open relict woodlands, and pools. By the 19th century the pond of the Kraenepoel may well have been no more than a humid depression which largely dried up in summer. However, in this shallow and nutrient-poor lake, a unique oligotrophic aquatic fauna and flora thrived. During the 2Oth century, the water quality gradually declined. Several factors contributed to this decline, such as abandonment of the traditional water level maintenance and extensive fish farming, an increase in silt from the surrounding forest litter, the diffuse inflow of nutrients and pollutants from the intensively-used surrounding farmland and from upmarket residential subdivisions, which conveniently drained their wastewater straight into the Kraenepoel. The last survivors of the oligotrophic plantlife disappeared. Furthermore, a dyke was built cutting the lake in two. After consultation with the previous owner and the competent authorities, a management agreement was concluded for the southern half of the pond in the 1980s, but it was never implemented because the municipality of Aalter did not succeed in getting effective control of the area. In 1996, however, the municipality acquired the southern half and concluded agreements with the owner of the northern half. The competent regional authorities for nature conservation (AMINAL-Natuur) were brought in as a partner to restore this biotope and this collaboration between private landowner, municipality and Flemish Region created the preconditions to restore the Kraenepoel.


Objectives

In order to restore the nutrient-poor conditions, the beneficiary had to achieve two results: internally, the removal of silt deposited over the years in the lake, and externally, control of the water level/quality to stop further input of polluted and nutrient-enriched water into the lake. To achieve optimum control of the water level, two constructions to regulate the in- and outflow of water were to be built, together with a temporary re-routing of the feeder rivulet Bloembeek. The next measure was to dredge the accumulated sediment from both parts of the pond. Also, the beneficiary planned to restore the reed fringes and to clear the non-native trees along the pond as an additional measure to restore the water quality. Simultaneous to this LIFE project, the regional water authorities (AMINAL-Water) and the provincial authorities planned wastewater treatment and sewer reticulation works in the vicinity, so as to end the diffuse pollution of the site.


Results

The project achieved its objectives: - preparatory research was carried out concerning the seed bank, macro-invertebrates, protists, zooplankton, fish and macrophytes in the site (partly with additional funds parallel to LIFE); - the entire lake was dredged (partly with additional funds parallel to LIFE); - the Bloembeek feeder rivulet was re-routed, following the acquisition of use rights to 0.2 ha. of land, so that polluted water no longer enters the lake; - an inflow and an outflow construction, with a fish-trapping device, were built to allow water levels to be controlled; - part of the dyke bisecting the pond was removed to restore connection between the two halves (with additional funds parallel to LIFE); - scrub and all non-native trees around the lake were removed to reduce eutrophication of the water by falling leaves and to increase the amount of light reaching the lake; - pond edges were restored with limestone in the northern part of the lake; - information panels were erected; - a monitoring system was put in place for tracking future ecological developments. The first vegetation association expected to expand as a result of the habitat restoration works are pond weeds of the Magnopotamion association. The restoration of the Kraenepoel proved technically more difficult and expensive than initially foreseen but thanks to an effective involvement of the regional competent conservation authorities (AMINAL-Natuur), the Commission for Monuments and Sites of the Regional Flemish Government and several scientists, these challenges were overcome. Completion of the sewer system and treatment of the water which would normally enter the lake via the Bloembeek is planned by the municipality of Aalter as part of its integral watercourse management for the Kraenepoelloop catchment.


Top


Environmental issues addressed:

Themes

Habitats - Freshwater


Keywords

lake‚  protected area‚  research project‚  land purchase‚  restoration measure


Target EU Legislation

  • Water
  • Directive 91/676 - Protection of waters against pollution caused by nitrates from agricultural so ...
  • Nature protection and Biodiversity
  • Directive 92/43 - Conservation of natural habitats and of wild fauna and flora- Habitats Directiv ...
  • Decision 93/626 - Conclusion of the Convention on Biological Diversity (25.10.1993)
  • COM(95) 189 - "Communication on the judicious use and conservation of wetlands" (12.12.1995)
  • COM(98)42 -"Communication on a European Community Biodiversity Strategy" (05.02.1998)
  • COM(2001)162 -"Biodiversity Action Plan for the conservation of natural resources (vol. I & II)" ...

Target Habitat types

  • 9190 - Old acidophilous oak woods with Quercus robur on sandy plains
  • 91E0 - "Alluvial forests with Alnus glutinosa and Fraxinus excelsior (Alno-Padion, Alnion incanae, Salicion albae)"
  • 3130 - Oligotrophic to mesotrophic standing waters with vegetation of the Littorelletea uniflorae and/or of the Isoëto-Nanojuncetea
  • 4010 - Northern Atlantic wet heaths with Erica tetralix
  • 4020 - Temperate Atlantic wet heaths with Erica ciliaris and Erica tetralix

Natura 2000 sites

SCI BE2300005 Bossen en heiden van zandig Vlaanderen: oostelijk deel


Top


Beneficiaries:

Coordinator Gemeente Aalter
Type of organisation Local authority
Description The municipality of Aalter (Gemeente Aalter) is located in the province of East Flanders (Oost-Vlaanderen), halfway between the cities of Gent and Brugge. Its service responsible for environmental matters was directly in charge of the project.
Partners AMINAL, Afdeling Natuur (Regional competent authority for nature conservation)

Top




Project reference LIFE98 NAT/B/005172
Duration 01-SEP-1998 to 30-NOV -2002
Total budget 675,225.55 €
EU contribution 337,612.78 €
Project location Vlaams Gewest(België - Belgique)

Top


Read more:

Brochure Title: Ecologisch Beheer van de Kraenepoel Aalter Author: Gemeente Aalter Year: 2002 Editor: Gemeente aalter
Publication: Article-Paper Title: Hoste, I. & L. Vanhecke, 2002. De Kraenepoel: herstel van een voedselarm water. De Levende Natuur: 103 (1): 26-27. Author: Hoste, I en L. Vanhecke Year: 2002 No of pages: 2

Top

Project description   Environmental issues   Beneficiaries   Administrative data   Read more   Print   PDF version