Navigation path

  • Mobile version
  • Follow EU_enterprise on Twitter
  • Facebook
  • Our YouTube channel
  • Our RSS feeds
Sustainable and responsible business

Air Conditioning and Ventilation Systems

An Ecodesign preparatory study, analysing whether and which ecodesign requirements should be set for air conditioning and ventilation systems (ENTR LOT 6), has been launched beginning of 2010.

Complete information can be found on the website of the study.

The selected contractor is Armines, France (Contact person: Philippe Rivière, philippe.riviere@mines-paristech.fr).

Stakeholders are encouraged to contact the contractor on their own initiative, should they consider it useful.

Information on similar Ecodesign preparatory studies such as residential airco and ventilation (ENER Lot 10), non-residential ventilation fans (ENER Lot 11), central heating products using hot air to distribute heat (ENER Lot 21) or refrigeration and freezing equipments: chillers (ENTR Lot 1) can be found on the linked websites.

Set page to normal font sizeIncrease font size by 200 percentsend this page to a friendprint this page