Navigation path


Notification

Found : 8
  Body :

TÜV Nord Luxembourg s.à.r.l.
124, bld de la Petrusse
L-2330 Luxembourg
Country : Luxembourg

Phone : +352 27177 220
Fax : +352 27177 700

Email : tnluxembourg@tuv-nord.com
Website : www.tuev-nord.de

Notified Body number : 2411

Last update : 20/09/2012
 

Return to legislation list

Some information about the accreditation details are available in the PDF
Legislation
2008/57/EC Interoperability of the rail system within the Community (Recast)    
Last update : 04/07/2013                 Version(s): 1 2 3

Products Procedures Articles/Annexes Technical Specifications for Interoperability
1. Interoperability of the trans-European high-speed rail system
   - 1.1 Infrastructure
EC declaration of conformity and suitability for use of interoperability constituents
EC verification procedure for subsystems
Annex IV
Annex VI
INF-HS Revision - 2008/217/EC
SRT - 2008/163/EC
PRM - 2008/164/EC
Omnibus 3 - 2012/464/EU
 
1. Interoperability of the trans-European high-speed rail system
   - 1.3 Control-command and signalling
EC declaration of conformity and suitability for use of interoperability constituents
EC verification procedure for subsystems
Annex IV
Annex VI
CCS Revision II - 2006/860/EC
CCS Revision III - 2007/153/EC
CCS Revision IV - 2008/386/EC
CCS Revision V - 2010/79/EC
CCS Revision VI - 2012/88/EU
CCS Revision VII - 2012/696/EU
 
1. Interoperability of the trans-European high-speed rail system
   - 1.4 Rolling stock
EC declaration of conformity and suitability for use of interoperability constituents
EC verification procedure for subsystems
Annex IV
Annex VI
SRT - 2008/163/EC
PRM - 2008/164/EC
RST-HS Revision - 2008/232/EC
Omnibus 3 - 2012/464/EU
 
2. Interoperability of the trans-European conventional rail system
   - 2.1 Infrastructure
EC declaration of conformity and suitability for use of interoperability constituents
EC verification procedure for subsystems
Annex IV
Annex VI
SRT - 2008/163/EC
PRM - 2008/164/EC
INF-CR - 2011/275/EU
Omnibus 3 - 2012/464/EU
 
2. Interoperability of the trans-European conventional rail system
   - 2.3 Control-command and signalling
EC declaration of conformity and suitability for use of interoperability constituents
EC verification procedure for subsystems
Annex IV
Annex VI
CCS Revision II - 2006/860/EC
CCS Revision III - 2007/153/EC
CCS Revision IV - 2008/386/EC
CCS-CR - 2006/679/EC
CCS-CR Revision V - 2009/561/EC
CCS Revision V - 2010/79/EC
CCS Revision VI - 2012/88/EU
CCS Revision VII - 2012/696/EU
 
2. Interoperability of the trans-European conventional rail system
   - 2.4 Rolling stock
EC declaration of conformity and suitability for use of interoperability constituents
EC verification procedure for subsystems
Annex IV
Annex VI
SRT - 2008/163/EC
PRM - 2008/164/EC
WAG-CR - 2006/861/EC
WAG-CR Revision - 2009/107/EC
NOI-CR Revision I - 2011/229/EU
LOC&PAS-CR - 2011/291/EU
Omnibus 3 - 2012/464/EU
WAG - Reg (EU) 321/2013
 
Set page to normal font size Increase font size by 200 percentprint this page