European Commission - Enterprise and Industry

For a better experience, please enable Javascript!


Notification

Found : 6
 
  Body (History):

ÅF- KONTROLL AB
Frösundaleden 2A
169 70 SOLNA
Country : Sweden

Phone : +46 (0)10 505 00 00
Fax : +46 (0)10 505 32 50

Email : info.inspection@afconsult.com
Website : www.afconsult.com

Notified Body number : 0640

Version(s): 1 2 3 4 5 6 7 8 9 10 11 12 13

Last update : 27/10/2010
 

Return to legislation list

Some information about the accreditation details are available in the PDF
Legislation
2008/57/EC Interoperability of the rail system within the Community (Recast)     (History)
Last update :
Products Procedures Articles/Annexes Technical Specifications for Interoperability
1. Interoperability of the trans-European high-speed rail system
   - 1.1 Infrastructure
EC verification procedure for subsystems Annex VI INF-HS - 2002/732/EC
INF-HS Revision - 2008/217/EC
PRM - 2008/164/EC
SRT - 2008/163/EC
 
1. Interoperability of the trans-European high-speed rail system
   - 1.2 Energy
EC verification procedure for subsystems Annex VI ENE-HS - 2002/733/EC
ENE-HS Revision - 2008/284/EC
SRT - 2008/163/EC
 
1. Interoperability of the trans-European high-speed rail system
   - 1.3 Control-command and signalling
EC verification procedure for subsystems Annex VI CCS Revision II - 2006/860/EC
CCS Revision III - 2007/153/EC
CCS Revision IV - 2008/386/EC
CCS-HS - 2002/731/EC
CCS-HS Revision I - 2004/447/EC
SRT - 2008/163/EC
 
2. Interoperability of the trans-European conventional rail system
   - 2.3 Control-command and signalling
EC verification procedure for subsystems Annex VI CCS Revision II - 2006/860/EC
CCS Revision III - 2007/153/EC
CCS Revision IV - 2008/386/EC
CCS Revision V - 2010/79/EC
CCS-CR - 2006/679/EC
CCS-CR Revision V - 2009/561/EC
SRT - 2008/163/EC