European Commission - Enterprise and Industry

For a better experience, please enable Javascript!


Notification

Found : 22
 
  Body :

CENTRALNY INSTYTUT OCHRONY PRACY - PANSTWOWY INSTYTUT BADAWCZY (CIOP-PIB)
ul. Czerniakowska 16
00-701 WARSZAWA
Country : Poland

Phone : +48 (22) 623 36 98
Fax : +48 (22) 623 3693

Email : modry@ciop.pl
Website : www.ciop.pl

Notified Body number : 1437

Version(s): 1 2 3 4 5 6

Last update : 09/01/2012
 

Return to legislation list

Some information about the accreditation details are available in the PDF
Legislation
2000/14/EC Noise emission in the environment by equipment for use outdoors     (History)
Last update : 25/08/2006                 Version(s): 1 2 3

Products Procedures Articles/Annexes
Equipment subject to noise limits
   - builders' hoists for the transport of goods (combustion-engine driven)
   - compaction machines (only vibrating and non-vibrating rollers, vibratory plates and vibratory rammers)
   - compressors (< 350 kW)
   - concrete-breakers and picks, hand-held
   - construction winches (combustion-engine driven)
   - dozers (< 500 kW)
   - dumpers (< 500 kW)
   - excavators, hydraulic or rope-operated (< 500 kW)
   - graders (< 500 kW)
   - hydraulic power packs
   - landfill compactors, loader-type with bucket (< 500 kW)
   - lawnmowers (excluding agricultural and forestry equipment, and multi-purpose devices, the main motorised component of which has an installed power of more than 20 kW)
   - lawn trimmers/lawn edge trimmers
   - loaders (< 500 kW)
   - lift trucks, combustion-engine driven, counterbalanced (excluding "other counterbalanced lift trucks" as defined in Annex I, item 36, second indent with a rated capacity of not more than 10 tonnes)
   - mobile cranes
   - motor hoes (< 3 kW)
   - paver-finishers (excluding paver-finishers equipped with a high-compaction screed)
   - power generators (< 400 kW)
   - tower cranes
   - welding generators
Full quality assurance
Internal control of production with assessment of technical documentation and periodical checking
Unit verification
Annex VIII
Annex VI
Annex VII