Navigation path

News feeds

Energy infrastructure

European Coordinators

The Decision No 1364/2006/EC of the European Parliament and of the Council of 6 September 2006 laying down guidelines for trans-European energy networks (TEN-E), foresees the appointment of European coordinators in order to monitor and to facilitate the implementation of the most critical identified priority projects. In this context, the appointment of Coordinators has also been mentioned as an opportunity for important infrastructures encountering difficulties in the conclusions of the European Council of 8/9 March 2007.

Four European coordinators have been appointed on the 12 September 2007 by the Commission for duration of four years and they will monitor projects facing technical, political or financial difficulties. The "Priority Interconnection Plan" adopted by the Commission on 10 January 2007 in the framework of the so-called "energy package" and the Action Plan adopted by the European Council on 9 March 2007 mentions specifically the nomination of European Coordinators. In November 2008 the mandate of a European coordinator was extend to the planned 380kV-Salzburgleitung. 

  • The French-Spanish connection (Mr. Mario Monti)
  • Baltic and North Sea off-shore wind connections (Mr. Adamowitsch)
  • The "Salzburgleitung": Austrian Power link Salzach neu - Tauern (Mr. Adamowitsch)
  • The axis linking Caspian Sea countries and the Middle East to the European Union, including the Nabucco pipeline (Mr. van Aartsen)
  • The northern European power-link (Mr. Mielczarski)

Baltic and North Sea off-shore wind connections

December 2009/October 2010

March 2009

  • Workshop "Development of offshore grid in the Baltic & North Sea area", 17 March 2009, Marseille

As one of the key deliverables in 2009, the European Coordinator organised the workshop "Development of offshore grid in the Baltic/North Sea area" as a side event to the European Wind Energy Conference 2009.

The results of the workshop are presented below.

Description and programme pdf - 36 KB [36 KB]

Session summary pdf - 2 MB [2 MB]

 

Speakers' presentations:

Development of the offshore grid in the Baltic/North Sea area (resume of the European Coordinator's first annual report) pdf - 3 MB [3 MB] , Mr Adamowitsch, European Coordinator

First European Offshore Grid at the Baltic Sea – KriegersFlak: Techniques, Economics and Challenges pdf - 908 KB [908 KB] , joint presentation, Mr Reinisch (Vattenfall Europe Transmission), Ms Orths (Energinet.dk) , Mr Moberg (Svenska Kraftnät)

Modular design for the development of the offshore/onshore grid in the North Sea pdf - 4 MB [4 MB] , Mr Hauglum (Statnett)

Financing renewables and transmission infrastructure projects pdf - 70 KB [70 KB] , Ms Bresesti (European Investment Bank)

Statements submitted to the European Coordinator pdf - 2 MB [2 MB]

 

September/October 2008

October 2008/November 2009

 

The "Salzburgleitung": Austrian Power link

  • Final report of the coordinator

Abschlussbericht pdf - 153 KB [153 KB]

Anlage 1: Vorschlag zur Trassenführung (Übersicht) jpeg - 2 MB [2 MB]

Anlage 1a: St Johann - Elixhausen jpeg - 11 MB [11 MB]

Anlage 1b: Kaprun - Wagrain jpeg - 10 MB [10 MB]

Anlage 2: Geführte Gespräche pdf - 17 KB [17 KB]

220kV-Trasse durch gemeindliche Entwicklung spätere Bebauung zip - 27 MB [27 MB]

  • Presentation of the 23rd July 2009

Abschlussbericht Präsentation pdf - 2 MB [2 MB]

The French-Spanish connection

Annex pdf - 298 KB [298 KB]

Map pdf - 88 KB [88 KB]

Juin 2008

  • Rapport Final du coordonnateur sur l'interconnexion électrique France - Espagne

Rapport portant sur le tronçon transfrontalier rédigé à la demande du Chef de l'Etat français, M. Sarkozy et du Président du Gouvernement espagnol, M. Zapatero

Rapport Final pdf - 457 KB [457 KB] All available translations.

Accord ratifié par les gouvernements français et espagnol sur l'interconnexion électique France-Espagne pdf - 344 KB [344 KB] All available translations. (27 juin 2008, Saragosse)

Answers to questions raised by the associations in the framework of the first information session pdf - 196 KB [196 KB]

Complementary answers to questions raised by the associations pdf - 224 KB [224 KB]

Comparaison of alignment options: full land solution and mixed (land -undersea) solution pdf - 3 MB [3 MB]

December 2007

  • Report on the justification of the France-Spain electric interconnection and technical information on undergounding solutions

Report pdf - 69 KB [69 KB] All available translations.

These studies are subject to a disclaimer and copyright. These studies have been carried out for the European Coordinator, who works independently within a general mandate given by the Commission. They express the opinion of the organisation undertaking the study. These views have not been adopted or in any way approved by the European Commission and should not be relied upon as a statement of the European Commission's or the Transport and Energy DG's views. The European Commission does not guarantee the accuracy of the information given in the study, nor does it accept responsibility for any use made thereof. Any reproduction or use of this study may only be authorized by the authors, upon a written request addressed to them

Justification of the line pdf - 6 MB [6 MB] All available translations.

Undergrounding solutions pdf - 11 MB [11 MB] All available translations.

Technical annexes pdf - 5 MB [5 MB] All available translations.

Comparaison of technological solutions pdf - 2 MB [2 MB]

Masterplan of electric interconnections through the Pyrénées pdf - 5 MB [5 MB]

The axis linking Caspian Sea countries and the Middle East to the European Union, including the Nabucco pipeline

DISCLAIMER

These studies are subject to a disclaimer and copyright. These studies have been carried out for the European Coordinator, who works independently within a general mandate given by the Commission. They express the opinion of the organisation undertaking the study. These views have not been adopted or in any way approved by the European Commission and should not be relied upon as a statement of the European Commission's or the Transport and Energy DG's views. The European Commission does not guarantee the accuracy of the information given in the study, nor does it accept responsibility for any use made thereof. Any reproduction or use of this study may only be authorized by the authors, upon a written request addressed to them.

Top