|
|
|
|
||||||||||||||||||||||
|
|
|
|||||||||||||||||||||||
|
|
The programme|User needs and service definition Programme phasesThe GALILEO programme comprises the following phases. During the definition phase, the Commission and the European Space Agency (ESA) have mobilised a very large part of the European space industry as well as a large number of potential service providers with a view to defining the basic elements of this project. A number of projects and comprehensive studies have contributed to this phase:
Based on the outcome of the definition Phase, the GALILEO Mission High Level Definition document (HLD) has been produced and consolidated through a consultation process, involving Members States, users and potential private investors. It presents a picture of the main characteristics and performance of the GALILEO Mission. It will be used as framework for the GALILEO programme and forms the basis for the Mission Requirements Document and the System Requirements Document. Two major activities have consolidated the definition of the GALILEO system:
The development and validation phase (2002 – 2005) covers the detailed definition and subsequent manufacture of the various system components: satellites, ground components, user receivers. This validation will require the putting into orbit of prototype satellites from 2005 and the creation of a minimal terrestrial infrastructure. It will allow the necessary adjustments to be made to the ground sector with a view to its global deployment and the launching, if necessary, of operational prototypes manufactured in parallel. During this phase it will also be possible to develop the receivers and local elements and to verify the frequency allocation conditions imposed by the International Telecommunication Union. Deployment and commercial operation The constellation deployment phase will consist in gradually putting all the operational satellites into orbit and in ensuring the full deployment of the ground infrastructure so as to be able to offer an operational service.
|
|||||||||||||||||||||||
| last update: 10-02-2009 |