Renovation of the Berlaymont

Type: Best-of   Reference: I-023803   Duration: 10:12:27  Lieu: Brussels - EC/Berlaymont
End production: 20/03/1998
The removal of asbestos in the Berlaymont building in Brussels is coming to an end. The basic operation, which was responsible for the removal of more than a thousand tons of asbestos sheeting since 1995, will be finished in May 1998. However the evacuation of the last hundred kilos of asbestos will take an additional year. By 1999, all the old structure of the Berlaymont will have disappeared and the concrete and iron framework will be accessible for a complete remodelling. The European Commission will be re-admitted to the building in 2002.

Only the original language version is authentic and it prevails in the event of its differing from the translated versions.
PDF version

TIME DESCRIPTION DURATION
10:00:00 Generic and title 00:00:27
10:00:28 1.Views of the Berlaymont 00:01:49
10:00:28 Panoramic shot of the Berlaymont building 00:00:14
10:00:42 Lift going up under protective tarpaulin 00:00:05
10:00:47 Worker with a protective mask 00:00:06
10:00:53 Lift going up under protective tarpaulin 00:00:05
10:00:58 View of workers from the lift 00:00:02
10:01:00 Leaving the lift 00:00:15
10:01:15 Interview (in FRENCH) of Mr. Bert De Bleeckere, Measures Co-ordinator of S.A. Berlaymont 2000 N.V., on the function of the two sheets of tarpaulin 00:00:51
10:02:06 View of the interior of the Berlaymont 00:00:08
10:02:14 Sign in the access passage indicating an exit 00:00:02
10:02:17 2. Security Measures on the Building Site 00:00:20
10:02:17 Changing-room 00:00:04
10:02:22 Fitting of an anti-asbestos mask 00:00:11
10:02:33 Close up on two masked worker's faces 00:00:04
10:02:37 3. Asbestos Removal 00:02:38
10:02:37 Entry into the protected zone via a long isolated corridor 00:00:26
10:03:03 Lift (2 shots) 00:00:10
10:03:13 Leaving the lift into an empty corridor 00:00:12
10:03:25 Another corridor (opposite) 00:00:05
10:03:30 Workers walking and close up on asbestos 00:00:10
10:03:40 Removal of asbestos in a floor and travelling shot to the dismantled ceiling 00:00:09
10:03:49 Worker with a circular saw 00:00:07
10:03:56 Dismantled floor 00:00:04
10:04:00 Ceiling of former press room 00:00:03
10:04:03 Interview of Mr. Bert De Bleeckere (in FRENCH) on the basic asbestos removal in the press room 00:00:19
10:04:22 Close up on a worker dismantling the press room ceiling 00:00:05
10:04:27 Asbestos sheets on the floor 00:00:01
10:04:29 Worker filling up bags with contaminated material (2 shots) 00:00:14
10:04:43 Taking away of these bags to the lifts (2 shots) 00:00:19
10:05:02 Bags leaving the lifts 00:00:08
10:05:10 Former VIP room 00:00:05
10:05:16 4. Extractor Fans 00:00:46
10:05:16 Close up on a contaminated air extractor 00:00:10
10:05:26 Interview with Mr. Bert De Bleeckere (in FRENCH) on the use of these extractors 00:00:22
10:05:48 Several extractors and travelling shot from the red cover to air vents 00:00:09
10:05:57 External views of these air vents and filters 00:00:05
10:06:03 Travelling shot from the Berlaymont to an atmosphere control gauge 00:00:08
10:06:11 Close up on this gauge 00:00:05
10:06:16 Flask containing asbestos fibres 00:00:03
10:06:19 Travelling shot to this flask 00:00:05
10:06:24 Hazard risk stickers "Attention amiante" (Warning Asbestos) 00:00:04
10:06:28 Permitted air pollution levels authorised in and out of the building site 00:00:05
10:06:33 "Building site maximum level, 150 fibres" 00:00:04
10:06:37 "Off site maximum level, 17 fibres" 00:00:05
10:06:42 5. Interviews 00:04:09
10:06:43 Interview (in FRENCH) with Professor Henri Vander Eycken, General Administrator of S.A. Berlaymont 2000 N.V. on the building site and asbestos removal 00:00:16
10:06:59 On the problems encountered at the beginning of the work 00:00:31
10:07:30 On asbestos in the air in the Berlaymont building and public health 00:01:02
10:08:32 On the fact that independent laboratories carry out the tests 00:00:29
10:09:01 On the budget 00:00:40
10:09:41 On the fact that after the basic asbestos removal, the removal of the remaining 100 kg will take an additional year and cost another billion. 00:00:37
10:10:18 On the end of the works 00:00:34
10:10:52 6. Berlaymont Exhibition 00:01:21
10:10:52 Travelling shot from people in the street to the Berlaymont exhibition sign 00:00:08
10:11:01 Close up on the sign 00:00:09
10:11:10 Mr. Steven Beckers, Head Architect working for S.A. Berlaymont 2000 00:00:05
10:11:15 Model of the new Berlaymont 00:00:15
10:11:30 New press rooms 00:00:04
10:11:34 Exhibition 00:00:08
10:11:42 Close up of another Berlaymont model 00:00:02
10:11:44 Interview (in FRENCH) of Mr. Steven Beckers on the 'louvres', the motorised glass slats on the sides of the new Berlaymont building 00:00:22
10:12:06 Closing of the 'louvres' 00:00:08
10:12:14 Black 00:00:00
10:12:15 Copyright 00:00:11
10:12:27 End 00:00:23
Audiovisual Services
European Commission
ec.europa.eu/avservices
 
Conditions of use